150 likes | 354 Views
Infrastructure Refresh. Why?. Industry Standard Servers. HP Proliant Generation Transition. Regenerate G4 to G6 2009. 14 to 1. 14 to 1. Regenerate G4 to G6 2010/G7. 20 to 1. Intel Xeon 5600. 14 to 1. Regenerate G4 to G7. 23 to 1. AMD Opteron 6100. 14 to 1. Save. 95% reduction
E N D
Infrastructure Refresh Why? Industry Standard Servers
Regenerate G4 to G6 2009 14 to 1 14 to 1
Regenerate G4 to G6 2010/G7 20 to 1 Intel Xeon 5600 14 to 1
Regenerate G4 to G7 23 to 1 AMD Opteron 6100 14 to 1
Save 95% reduction in number of servers 95% reduction in licence costs 97% reduction in energy costs 383% reduction in support costs
27x More compute capability in the same power envelope
HP BladeSystem 32% reduction in energy costs 41% reduction in hardware costs 50% reduction in space needed 80% reduction in labour/management costs Source: Alinian Analysis of savings over 5 years in a inner city public sector organisation. 48 x DL360 quad core VS. 48 x BL460C quad core with virtual connect
$48,300 saving per 100 users over 3 years 6 month ROI