THE DREDGING WORKS ON THE SEA APPROACH CHANNEL IN SE STP YUZHNY

THE DREDGING WORKS ON THE SEA APPROACH CHANNEL IN SE STP YUZHNY. State enterprise “Sea trade port “ Yuzhny ” is located on the North-West coast of the Black sea in the non-freezing Adzhalykskiy firth which is 30 km far northeastearly from the Odessa seaport. 2.

swann
Download Presentation

THE DREDGING WORKS ON THE SEA APPROACH CHANNEL IN SE STP YUZHNY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE DREDGING WORKS ON THE SEA APPROACH CHANNEL IN SE STP YUZHNY

  2. State enterprise “Sea trade port “Yuzhny” is located on the North-West coast of the Black sea in the non-freezing Adzhalykskiy firth which is 30 km far northeastearly from the Odessa seaport 2

  3. The dredging works on the sea approach channel and the internal waterway approach to the port deep-water berths The Project provided: Dredging works on the sea approach channel (width 230,0 m, depths 21,0 m) Dredging works on the internal waterway approach Dredging works on operational water area of the berth №№ 5, 6 (depth 19,0 m) Development of the reversal range for the berths №№ 5,6 (diam. 600,0 m, depth 21,0 m) The technical characteristics: Cumulative volume of dredging works – 14,335 million c.m. Cumulative area of dredging works - 200 ha Project implementation period 2012 - 2014 years The construction cost - 1billion grn. Financing of the project  The project will be financed by the port. 3

  4. The effect of the implementation of the project of water area dredging works up to 21 metres

  5. THANK YOU FOR ATTENTION