1 / 2

LLNL activities relevant to collaboration with the FSC

LLNL activities relevant to collaboration with the FSC OFES FI concept exploration ( GA, UC Davis/Ohio State , Princeton) OFES ignition target design ( Partly directed to FI targets ) Expt. collaborations RAL, ILE Osaka ,LULI, LLE

tab
Download Presentation

LLNL activities relevant to collaboration with the FSC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LLNL activities relevant to collaboration with the FSC • OFES FI concept exploration ( GA, UC Davis/Ohio State , Princeton) • OFES ignition target design ( Partly directed to FI targets ) • Expt. collaborations RAL, ILE Osaka ,LULI, LLE • Collaboration in GA /ILE/LLE FI hydro study in Omega NLUF program • LDRD Short Pulse Science and Technology Initiative • - Science R&D for HED science at NIF • -Technology R&D and project for short pulse at NIF • -JISP upgrade of Janus and JanUSP • -Campaign experiments at RAL Vulcan • -LSP , ZoharB - short pulse modeling - development and expt links • -Several LDRD HED science projects including • -New FY05 LDRD to develop science base for FI experiments at NIF • (with UCSD , Reno, UC Davis ,/OSU,GA )

  2. Outline expected FI experiments through FY05 • JanUSP technique development expt ( current ) • RAL PW laser campaign( part FI related ) (Nov/Dec2004) • -several HEDP themes not FI (related) • -Proton heating • -Electron transport ( cones and slabs ) • Norreys bilateral FI expt RAL PW( details TBD) Feb 2005 • ILE Bilateral expts( 2004/2005 TBD ) • Ist JanISP expt ( Aug 2005?) details TBD • JanUSP expts in 2005? Bidding process TBD • Planning of expts typically a six month process • Instrument synergy benefits in multi- purpose campaigns

More Related