1 / 3

Achievements Past Month

IT: AZ-SLDS: MCESA REIL July 2011. Scope and Objectives. ADE/MCESA will meet the MCESA REIL grant objective. This will be done by: A teacher Identifier system with ability to match teachers to students

tessa
Download Presentation

Achievements Past Month

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IT: AZ-SLDS:MCESA REIL July 2011 Scope and Objectives • ADE/MCESA will meet the MCESA REIL grant objective. This will be done by: • A teacher Identifier system with ability to match teachers to students • Sample Use Case: Student “A” is assigned to Teacher “1” and Teacher “2”. The project will map Student “A” to both Teacher “1” and Teacher “2” • Student level transcript information, including courses completed and grades earned • Ensure students graduate college-ready by increasing student achievement and growth in all content areas • Enhance careers for effective teachers and principals by implementing a fiscally sustainable, performance-based compensation system • Develop talent in teaching and leading through a sustainable, comprehensive program of performance-based evaluation and support • Migration of the student/teacher/course data from district level SIS systems and HR systems for a specified job time to be pushed to ADE portal to Relational Database System potentially utilizing SQL Server Integration Services (SSIS) packages as transformations solutions Project Status Milestones Achievements Past Month Plans Next Month • In the process of gathering requirements on Evaluation Data Capture tool for REIL • Discovery with REIL team on further products that are components of the REIL Data Management System (DMS) • Finalizing IGA • Visualization requirements working sessions with MCESA stakeholders • Draft Portal/Dashboard BI requirements documentation • Finalize project schedule • Finalize Project Management Plan Risks / Issues / Change Requests

  2. MCESA REIL Schedule

More Related