1 / 11

clarkmccarthylaxcup Central Utility Plant Replacement @ LAX Pre Bid and Subcontractor Outreach Meeting May 10

www.clarkmccarthylaxcup.com Central Utility Plant Replacement @ LAX Pre Bid and Subcontractor Outreach Meeting May 10, 2011 (9am – 11am). Meeting Agenda www.clarkmccarthylaxcup.com. Registration Introductions Project Overview Current Bid Opportunities M/W/OBE Goals

urania
Download Presentation

clarkmccarthylaxcup Central Utility Plant Replacement @ LAX Pre Bid and Subcontractor Outreach Meeting May 10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. www.clarkmccarthylaxcup.comCentral Utility Plant Replacement @ LAX Pre Bid and Subcontractor Outreach MeetingMay 10, 2011 (9am – 11am)

  2. Meeting Agendawww.clarkmccarthylaxcup.com • Registration • Introductions • Project Overview • Current Bid Opportunities • M/W/OBE Goals • Subcontractor Qualification • Access to Project Info • Network Opportunity

  3. Introductionswww.clarkmcarthylaxcup.com Lou Palandrani Officer in Charge Dan Dumke Project Executive Kevin Carpenter Design Manager Chad Lee Project Director Kwaku Gyabaah Director of Purchasing Marcus Reese Purchasing Coordinator Molly Huddleston Estimating Coordinator Theodora Oyie Outreach Coordinator

  4. Project Overviewwww.clarkmccarthylaxcup.com • Design Build Delivery • Maintain Ongoing Operations • Phased Turnover Schedule • Project Labor Agreement • LEED Silver • Completion May 2014

  5. Project Overviewwww.clarkmccarthylaxcup.com

  6. Current Bid Opportunitieswww.clarkmccarthylaxcup.com

  7. Current Bid Opportunitieswww.clarkmccarthylaxcup.com

  8. Current Bid Opportunitieswww.clarkmccarthylaxcup.com Demolition Fire Proofing Haz Mat Remediation Excavation & Shoring Structural Concrete Fire Protection Reinforcing Steel Conveying Systems Metal Stairs Metal Framing & Drywall Metal Deck Building Enclosure System Bridge Crane**

  9. Subcontractor M/W/OBE Goalswww.clarkmccarthylaxcup.com The anticipated level of participation for this project has been set by LAWA at 16% MBE/WBE/OBE for the Construction Phase. Bidder Certification CEC Form 50, available at http://www.lawa.org/welcome

  10. Subcontractor Qualificationwww.clarkmccarthylaxcup.com www.clarkextranet.com/subform

  11. www.clarkmccarthylaxcup.comCentral Utility Plant Replacement @ LAX Pre Bid and Subcontractor Outreach MeetingMay 10, 2011 (9am – 11am)

More Related