2. Maharashtra Energy Development Agency. Registered under Society Act ? 1860Commenced functioning from July 1986 Chairman: Minister, Non- Conventional EnergyMember Secretary: Director GeneralGoverning Body: Six other SecretariesMEDA's mandate :SNA- to assist State and Federal Govt.Promotion
E N D
1. 1
2. 2 Maharashtra Energy Development Agency Registered under Society Act – 1860
Commenced functioning from July 1986
Chairman: Minister, Non- Conventional Energy
Member Secretary: Director General
Governing Body: Six other Secretaries
MEDA’s mandate :
SNA- to assist State and Federal Govt.
Promotion of Renewable Energy in the State
Facilitate Energy Conservation
3. 3
4. 4
5. 5
6. 6
7. 7
8. 8 GRID CONNECTED POWER PROJECTS
9. 9 WIND ENERGY
10. 10 Wind Energy Scenario in India
11. 11
12. 12 Policy Initiatives by Central and State Govt. I) Centre for Wind Energy Technology (C-WET)- Coordinating Agency
Established 1050 wind monitoring and wind mapping stations covered 25 States and Union Territories
216 Potential Windy sites identified
II) A package of fiscal and financial incentives is available
Concessions such as 80% accelerated depreciation
Income tax exemption for 10 years
Concessional custom duty on specified items
Excise /Customs duty exemption
Sales tax exemption
III) IREDA Loan for Projects with concessional Rate of Interest
IV) State Subsidy :
Evacuation – 50%
Approach Roads- 100%
11% share capital to Cooperative Wind Power projects
NO Electricity Duty for Captive Use- first Five Years
V) Tariff by MERC- Cost + Profit Approach
13. 13 Wind Resource Assessment in Maharashtra
14. 14 POLICY INITIATIVES for Bagasse Cogeneration, Biomass Power, Small Hydro Projects and Waste to Energy Projectsby Central and State Govt. I) A package of fiscal and financial incentives is available
Capital Subsidies
Concessions such as 80% accelerated depreciation,
Income tax exemption for 10 years,
Concessional custom duty on specified items,
Excise / Customs duty exemption,
Sales tax exemption
II) IREDA Loan for Projects with cocessional Rate of Interest
III) Infrastructure Subsidy (proposed)
Evacuation – 50%
Approach Roads- 100%
IV) Tariff by MERC- Cost + Profit Approach
15. 15 Bagasse Cogeneration Sugar factories– 202 (Cooperative – 179, Private – 23)
Availability of Bagasse ~ 27.30 MMT
Cogeneration Potential – 1250 MW
Cooperatives having Cogeneration – 20 nos.
Installed Capacity – 173 MW
Surplus power to Grid – 125 MW (PLF 75% - 80%)
16. 16 Biomass Power Projects Total Power Potential – 781 MW
Biomass Power Projects (IPP) approved – 31Nos - 337MW
Biomass Power Project Commissioned – 58 MW
17. 17 Hydro Energy Projects Mandate to MEDA for developing hydro projects upto 5 MW on run-of-river, waterfalls and KT Weirs
Total Power Potential ~ 600 MW-
Commisioned ~218 MW
Master Plan for developing hydro projects in tribal areas comprising 15 districts 68 talukas in State is prepared
Investigation of new sites and preparation of master plan for other area (non-tribal) is underway
18. 18
19. 19
NON GRID CONNECTED SYSTEMS
20. 20
21. 21
22. 22
23. 23
24. 24 Thank You