1 / 13

JAXA CCSDS Status

JAXA CCSDS Status. January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp ). JAXA CCSDS Principal Delegate and Staff members. CCSDS Implementation Status. Spacecraft

vivien
Download Presentation

JAXA CCSDS Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JAXA CCSDS Status January 25, 2007 CMC Colorado Springs, USA Yoshitaka Taromaru JAXA CCSDS Secretary Office ( JAXA.CCSDS@jaxa.jp ) CMC, 25 Jan. 07

  2. JAXA CCSDS Principal Delegate and Staff members CMC, 25 Jan. 07

  3. CCSDS Implementation Status • Spacecraft • JAXA adopted AOS (including TM) and/or TC for 10 spacecrafts was launched and 5 spacecrafts will be launched in the near future. • Other Japanese organization adopted AOS and/or TC for 4 spacecrafts was launched. CMC, 25 Jan. 07

  4. ←Relay sat. (Rstar) ←VRAD sat. (Vstar) CCSDS Implementation Status Overview of SELENE • SELENE will be launched by H-IIA rocket in FY 2007. The SELenological and ENgineering Explorer "SELENE", Japan’s first large lunar explorer, will be launched by the H-IIA rocket in 2007. The major objectives of the mission are to understand the Moon’s origin and evolution, and to observe the moon in various ways in order to utilize it in the future. Main orbiter↑ CMC, 25 Jan. 07

  5. CCSDS Implementation Status Overview of JEM • JEM will be launched by Space Shuttle in FY 2007. The Japanese Experiment Module (JEM) "KIBO," the first Japanese manned experimental facility, will be docked to the ISS in 2007. KIBO consists of two facilities. The Pressurized Module which is 11.2 metres long and 4.4 metres in diameter, will allow astronauts to work in a comfortable environment with air composition and pressure similar to Earth’s. The Exposed Facility will be a staging area for long-term experiments in open space, as well as Earth and astronomical observations. The Exposed Facility is a unique facility in that it enables astronauts to conduct experiments with direct exposure to space without any modification. CMC, 25 Jan. 07

  6. CCSDS Implementation Status Overview of WINDS • WINDS will be launched by H-IIA rocket in FY 2007. WINDS will be launched by an H-IIA Launch Vehicle in the fiscal year 2007 to establish the world's most advanced information and telecommunications network. The WINDS project is responsible for the demonstration of the validity and usefulness of technologies related to large-capacity data communications in our space infrastructure project, "i-Space," the purpose of which is to promote the use of satellites in such fields as Internet communications, education, medicine, disaster measures and Intelligent Transport Systems. CMC, 25 Jan. 07

  7. CCSDS Implementation Status Overview of GOSAT • GOSAT will be launched by H-IIA rocket in FY 2008. GOSAT is a satellite that aims to contribute to the Kyoto Protocol by monitoring the distribution of the density of carbon dioxide, which is one Greenhouse gas. GOSAT is scheduled to be launched in 2008 August. GOSAT will enable the precise monitoring of the density of carbon dioxide by combining global observation data sent from space with data obtained on land, and with simulation models. CMC, 25 Jan. 07

  8. CCSDS Implementation Status • Space Link Service (SLS) [Implementation] • JAXA ground network provides the Telecommand and AOS compatible capability (5 domestic stations and 4 overseas stations) • Katsuura, Masuda, Okinawa, Usuda and Uchinoura (Domestic) • Kiruna, Perth, Maspalomas and Santiago (Overseas) • Two refurbished antennas at Katsuura and Okinawa will be added to the network in FY2007. [Under studying] • As coding method, Turbo Code Decoder compliant with CCSDS standard is under studying for deep space mission. CMC, 25 Jan. 07

  9. CCSDS Implementation Status JAXA Network location Sagamihara Space Operation Center [SSOC] Tsukuba Space Center [TKSC] Tracking And Control Center [TACC] Katsuura [KTU1, S-band, 10m] [KTU2, S-band, 13m] Usuda [UDSC, S/X-band, 64m] Masuda [MSD1, S-band, 10m] Uchinoura [USC, S/X-band, 34m/20m/10m] Okinawa [OKN1, S-band, 10m] [OKN2, S-band, 18m] Maspalomas [MSP1, S-band, 10m] Kiruna [KRN1, S-band, 10m] Santiago [SNT1, S-band, 10m] Perth [PRT1, S-band, 10m] Data Relay Test Satellite [DRTS, S/Ka-band, 90.75degE] CMC, 25 Jan. 07

  10. CCSDS Implementation Status • SLE Transfer Service • JAXA implemented SLE GW at TACC (Tracking And Control Center at Tsukuba) and SSOC (Sagamihara Space Operation Center) , and these GWs are supporting LEOP and routine operations of ASTRO-F and SOLAR-B. • SLE GW at SSOC is also enabling MUSES-C and SELENE mission to utilize JPL/DSN. • JAXA started coordination with ESA on SLE connection for future emergency cross support architecture. CMC, 25 Jan. 07

  11. CCSDS Implementation Status ALOS,ETS-VIII, WINDS, GOSAT,MUSES-C, ASTRO-E2, ASTRO-F, SOLAR-B, SELENE, INDEX, etc. Uchinoura Space Center Usuda Deep Space Center SN GN DSN @ Tsukuba @ Sagamihara SLE (RAF / FCLTU) SLE (RAF / FCLTU) JPL SLE GW SLE GW SLE GW JAXA CCSDS S/C MUSES-C, SELENE Tracking and Control Center (TACC) Sagamihara Space Operation Center (SSOC) ESTRACK ESA SLE Under coordination JAXA Internal SLE connection CNES CMC, 25 Jan. 07

  12. CCSDS Implementation Status • SLE Service Management • Based upon IOAG-10 discussion, JAXA started development of Service Management prototype system for interoperability test. Development Interoperability Test Development CMC, 25 Jan. 07

  13. CCSDS Implementation Status • MOIMS/Navigation • For SELENE mission, JAXA is implementing ODM module on Flight Dynamics System. • JAXA/ISAS VLBI staff joined Delta-DOR SIG for white book development with ESA and NASA to contribute toward standardization of Delta-DOR method and related data transfer service. CMC, 25 Jan. 07

More Related