An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HCAL TPG Status Tullio Grassi University of Maryland May 2004 HCAL TriDAS

  2. TTC Minicrate F A N O U T F A N O U T F A N O U T Rack-to-Rack CAT 6/7 ECAL (18 crates) H T R H T R H T R H T R D C C F A N O U T H T R H T R H T R H T R D C C F A N O U T 16 HCAL VME Crates Clock & BC0 Distribution • “RX_CLK” and “RX_BC0” signals for all CAL TPGs transmission • Implement this requirement using 2 or 3-stage fanout scheme • Details to be defined with ECAL. HCAL TriDAS

  3. Fanout board - features • Built by J. Mans and C. Tully at Princeton • Fanout 4 differential LVPECL signals over cat6 with RJ45 connectors: • RX_CLK, • RX_BC0 • TTC serial stream • 80MHz Ref_Clk • Board operates in 2 modes • Global (unique board for ECAL and HCAL) • Crate • Successfully used in 2003 testbeam and all current HCAL R&D test stands • J.C. da Silva received one board for evaluation and “blessing” HCAL TriDAS

  4. G G C G C G C FPGA Decoding Progr. Delay Fanout Board - diagram TTCrx TTC Broadcast TTC fiber P1 40MHz TTC_CLK QPLL implemented this way allows RX_CLK to be “cleaned” at each board if needed QPLL can run stand-alone Clk80 QPLL P2 18 Identical Outputs (also as timing) RX_CLK INT_BC0 RX_BC0 EXT_BC0 RX_CLK Input from GLOBAL Fanout 80MHz RX_BC0 HCAL TriDAS

  5. HTR SLB Max skew on HTR traces is 0.7 ns. SLB SLB SLB SLB SLB Complete path of a 40MHz RX_CLK Fanout board in Global-mode TTCrx CLK40_Des1 TTC fiber 3.3V CMOS • Path is 3.3V differential PECL unless otherwise stated. • Path of RX_BC0 is similar but comes from the FPGA rather the QPLL • In the Global-mode card, do not mount the buffers for CLK80 and TTC QPLL FPGA CAT7 (RX_CLK,RX_BC0) CAT7 (RX_CLK, RX_BC0, TTC, CLK80) TTCrx QPLL TPG spec is: Skew <  6 ns across HCAL and ECAL FPGA Fanout board in Crate-mode HCAL TriDAS

  6. TTC-PMC mezzanine (UMD) • Carry TTCrx onto HCAL boards (HTR, DCC, Fanout) • Money-saver as it eliminated a lot of optical components and Fine-Line BGAs on 9U boards. • Production is done (~350 boards) • The assembly house mounted all LEDs backward • Test in progress (100% yield so far) HCAL TriDAS

  7. SLB Async Fifo SLB SLB SLB SLB SLB HTR Schematic Fanout Card (1/VME crate) Fiber Data Serial FE-Data LC Deserializers (8) CLK80 Ref Clk Recovered Clk 20 TTCrx mezzanine TTC RX_BC0 Crystal RX_CLK40 PLL TTC 40 Clk x2 SYS80 Clk TTC Broadcast SYS40 Clk TPG Path XILINX HCAL TriDAS

  8. HTR Rev4 Status • Current (Rev4) board – 3 in lab now • Testing: •  Links/Clocks (same as Rev3, no problems, no mystery at UMD) •  DAQ path exactly same as Rev3 •  Trigger Primitive Generation (basic features) •  Integration with SLB (next slide) HCAL TriDAS

  9. Trigger link and SLB testing • Control of SLB (“Local Bus”) seems ok • JTAG working (connector on P3 area of motherboard) • Link tests between SLB and Wisconsin receiver board (STC) • HP signal generator  120MHz clock for Receiver-STC • 120MHz divided by 3 and injected into TTC system • SLB runs with RX_CLK extracted from TTC+QPLL • 1.2Gbaud copper link: verified • Some tests of Cat6 cable showed BER increases by ~10 compared to skew-clear cables. • This could be fine, depending on the final cable length HCAL TriDAS

  10. Trigger link and SLB testing Problems In our setup we have seen 2 problems, but we had not much time to investigate: • Two pairs seem swapped (we see A,B,D,C instead of A,B,C,D) • Data are mis-aligned from pair-to-pair. The mis-alignement changes every time we restart. We think that these are not a hardware or PCB problems, but cabling or firmware. HCAL TriDAS

  11. UW Vitesse receiver mezzanine card SLB site HTR Trigger Link testing • So far, used Wisconsin STC boards. For commissioning and mass-production we need something different: • More channels • Programmable to optimize the test setup • Layout underway for an SLB/Vitesse mezzanine transition • Allows to plug a Vitesse-Rx-mezzanine on each SLB post. • Run backwards into motherboard • Board is now under design • Delays as an engineer left. HCAL TriDAS

  12. Production Issues Fiber Optics • Some problems not fully understood. • Seem more related to optical cables, connectors, laser • Changing the receiver (HTR) is not considered Yield (excluding optics) • Last year batch (Rev3) had 5 bad boards out of 30 • Only 1 was fixed (assembler mounted wrong part) • Not much time to find out the problems • Assembler seems the best in the area. HCAL TriDAS

  13. HTR Plans Testbeam04 in CERN • At some point we want to use the last version (Rev4) • Issue: we only have 3 now. • HF needs 2 HTRs to run HTR-RCT Integration test in Wisconsin • Start on May 24th • Will try to put energy on a given bunch and generate an L1A • Main goal is to validate all hardware • If Wisconsin and Maryland groups are satisfied with the Integration Tests, we will launch the HTR production. HCAL TriDAS

  14. 46 clocks = 1,147.7ns RBX HPD or PMT (HF) RCT HTR HCAL O-E QIE CCA GOL BX TOF Data To RCT SLB To RBX Level 1 Latency • Nothing has changed (46 clock tick budget) • FPGA logic does not include summing! • Estimates: probably 1 more clock cycle in HF • Eliminating summing in overlap might be ok for MET/Jet triggers • But would still have the 1→ 6 summing in HF 12-13 HCAL TriDAS

  15. TPG Alignment • Align so that all ECAL and HCAL data from same bucket reaches RCT inputs at same time • Achieved by delaying each channel individually • Method for establishing this delay implemented inside SLB • Histogram data over threshold, look for LHC structure pattern • Issue: For some detectors, occupancy is very low (HO, especially at low lumens) Ch N Ch N+1 Ch N+2 RX_BC0 (Global) HCAL TriDAS

  16. Absolute (and Relative) Timing • Relative timing within HCAL via: • Laser and LEDs • Have to consider random latency variation after resynching optical links • Cross-check with BC0 from FE • Absolute synchronization for Level 1 • SLB histograms ET • Looks for LHC beam structure • Does this work? (esp at low luminosity?) • Salavat has been working on this • Min bias events, some with Orca and some with fast sim • Occupancy at 1034 shown here • 250MeV per ADC count • Question: how many orbits to establish the LHC beam structure per detector? HCAL TriDAS

  17. Summary (from Salavat) • At 2x1033 HCAL TriDAS

  18. Summary (from Salavat) • For HB, HE, and HF probably easy to remeasure “on the fly” • Fill SLB histograms, read out over VME, calculate offset… • For HO, probably will take few hours to maybe even a day • OK as long as absolute (non random) latency is stable over long periods • Need more simulation, checks…in progress HCAL TriDAS

  19. Occupancy Implications and Alignment • Bottom line: Will try to develop the following algorithm: • Whatever it takes, we measure the absolute alignment • If it takes hours, then so be it... • We hope that this absolute alignment will not change over time • Keep track of the relative alignment by: • Sending up a BC0 signal from the FE • Keep track of this. If the links go down and we reset, then we measure the relative alignment and adjust accordingly • Problems: • If we are off by an order of magnitude or more... • Needs some more simulation, computing resources, etc. • Assumes long term stabilities which will have to be tracked HCAL TriDAS

  20. Another Latency Issue • TTCrx chip has a chip-to-chip variation in latency of ~20ns • Affect only the DAQ-path • How well known is this? • Need a scheme for insitu calibration of the TTCrx latency • Probably can come up with something for HTR/DCC/Fanout • Not sure what to do about TTCrx in FE... HCAL TriDAS