130 likes | 152 Views
Check the status of HF, HE, HO, and HB cables as of June 6, 2007. Includes remarks on required cable changes, wire cutting, and cable ordering.
E N D
Hcal cable installation status, • Prepared by sasha vishnevski, • June 6, 2007
HO-1 Far side cables HO-1 Near side cables
HO-2 Far side cables HO-2 Near side cables
HO+1 Far side cables HO+1 Near side cables
HO+2 Far side cables HO+2 Near side cables
HB cables Not installed • Remarks: • Change of cable DB is needed (in accordance with Sergeev’s request). • Wire cables have to be cut. • 3. Assembly of 4 bundles (from 12) with optical fibers has to be finished. • 4. Laser cables have to be produced.
HO 0 cables Not installed • Remarks: • 1. Wire cables have to be cut. • Ordering of TTC cables (3 pc, with 6 fibers each) has to be done. • Ordering of Calib. Cables (3 pc, with 6 fibers each) has to be done. • Laser cables have to be produced.