1 / 9

SAO section meeting

SAO section meeting. Agenda: CC evolution Future tools Interactions between Operations and Sysadmins Offices and other arrangements AOB. CC Evolution. B513 – New IT room For critical equipment only 90 racks – 450kW – Passive water-cooled racks

xuefang-jun
Download Presentation

SAO section meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAO section meeting Agenda: CC evolution Future tools Interactions between Operations and Sysadmins Offices and other arrangements AOB

  2. CC Evolution • B513 – New IT room • For critical equipment only • 90 racks – 450kW – Passive water-cooled racks • Dedicated and redundant cooling installation • Available November 2012 • First servers end-2012/beginning-2013 • In principle, no move of servers – move of services • B513 – Other improvements • Better cooling (and fire protection) of telecom areas • Better cooling of R-050 in case of power cut SAO – Feb 2012 - 100611 - 2

  3. CC Evolution (http://cern.ch/it/cc2012) • B513 – New IT room • For critical equipment only • 90 racks – 450kW – Passive water-cooled racks • Dedicated and redundant cooling installation • Available November 2012 • First servers end-2012/beginning-2013 • In principle, no move of servers – move of services • B513 – Other improvements • Better cooling (and fire protection) of telecom areas • Better cooling of R-050 in case of power cut SAO – Feb 2012 - 100611 - 3

  4. 3D view of the ground floor SAO – Feb 2012 - 4

  5. Telecom critical area SAO – Feb 2012 - 5

  6. CC Evolution • Remote Centre • Decision known end-March • First servers early 2013, if possible before • Procurement, system administration and part of the Operations done by CF with our standard tools and workflows • Hw repairs and part of the operations done by the remote centre • Many “details” to arrange SAO – Feb 2012 - 100611 - 6

  7. TOOLS • ServiceNow • Will replace ITCM and HMS • Aggressive timing • Agile • Will replace Lemon (including CDB, LEAF, LAS, etc) • High priority • Should nicely interface with our tools (Remedy/SNOW) • SAO should be able to work with adequate tools • Everyone encouraged to follow new developments – Fabio in charge for sysadmins, Anthony for operations • We have to ensure that our needs are correctly understood and implemented SAO – Feb 2012 - 100611 - 7

  8. Operations/Sysadmins • Open discussion – Intro by Gregory SAO – Feb 2012 - 100611 - 8

  9. Offices and more • Offices • AOB SAO – Feb 2012 - 100611 - 9