Springfield Data Center Program Energy Strategy Meeting 9/29/2009. Springfield Data Center – Energy Strategy. What are the Design Principals for the Springfield Data Center?. Efficient – Minimize Operation Costs for the Facility Measure: Compare Costs to Similar Facilities
E N D
Springfield Data Center ProgramEnergy Strategy Meeting9/29/2009
Springfield Data Center – Energy Strategy What are the Design Principals for the Springfield Data Center? Efficient – Minimize Operation Costs for the Facility Measure: Compare Costs to Similar Facilities Reliable – Provide Continuous Business Operations Measure: Design to Tier III Reliability Standards Secure – Ensure the Security of the Commonwealth’s Digital Assets Measure: Support the ISO 27001 Standard Green – Lead by Example with a Showcase Green Facility Measure: Obtain Mass LEED Plus Certification 8/28/2014 2
Springfield Data Center - Energy Strategy What is the Operations Model for the Two Data Centers? 53 Elliot Street Springfield MA 200 Arlington Street Chelsea, MA 93.82 Miles or 150 Km Active/Active Phase 1 Backup Site for MITC (40% of May 2012 MITC Apps) New Stand Alone Systems Phase 2 Build 2nd Expansion Primary Management Site Out of Capacity Modernize MITC Equipment May 2012 May 2013 May 2020 8/28/2014 3
Springfield Data Center - Energy Strategy What is the Schedule? We are here 8/28/2014 4
Springfield Data Center – Energy Strategy Who are the organizations that developed and will help implement the Energy Strategy? Energy Strategy Team ANF EOEA EOHED Division of Capital Asset Management (DCAM) Information Technology Division (ITD) Department of Energy (ENE) • Economic Development • Office • Study Office • Construction Office • Energy Program • SPGDC Program • CTO’s Office • Lead by Example • Energy Markets Operational Services Division (OSC) • Energy Contracts 8/28/2014 5
Springfield Data Center Energy Strategy What is the Baseline Energy Demand, Energy Cost, and Carbon Footprint of DC2? Baseline = Projected Electrical Load without any “Green” Solutions Over the Life of the 20 Year Program…. • Annual Averages over the 20 Years • Electrical Capacity: 5.4 MW or 4320 Homes • Electrical Usage: 49 GW or 15% of Today’s Statewide Power Contract • Carbon Emissions: 22,320 Tons or Emissions from 14,880 Cars • 20 Year Totals • Electrical Usage: 1 Tera-Watt Hour or 1,000,000 KW Hours • Electrical Costs: $123 Million or 112% of the Total Project Capital Cost • Carbon Emissions: 468,000 Tons of CO2 or Emissions from 332,000 Cars The Central Goal of the Energy Strategy is to Improve Upon the Baseline 8/28/2014 6
Springfield Data Center – Energy Strategy What is our Energy Strategy for the Data Center? Springfield Data Center Energy Strategy Energy Strategy A coordianted program to design, construct, and operate a ‘showcase’ green data center demonstrating leadership in five key components: Efficient Green Data Center Infrastructure, Sustainable Green Building Design, Consolidated and Green Computing Technology, Renewable and Cost Competitive Energy Sources, Green Jobs • Efficient • Green Data Center Infrastructure • Sustainable • Green Building Design • Consolidated • Green • Computing Technology Renewable Energy Green Jobs 8/28/2014 7
Springfield Data Center Energy Strategy • Efficient • Green Data Center Infrastructure • Sustainable • Green Building Design • Consolidated • Green • Computing Technology Renewable Energy Green Jobs Springfield Data Center – Energy Strategy What are the objectives for the Strategy? • Efficient • - Maximize our efficiencies by applying Data Center best practices. • Sustainable • Reduce and re-use water, reduced use of toxic materials • Historic use of the façade, daylight harvesting • (EO484) • Consolidated • Consolidate computer systems and reduce energy demand • (Industry Best Practice) • Renewable Energy • -Utilize renewable energy sources, 25% by 2012, 30% by 2020 • (EO484) • -Obtain long term cost competitive New England based rates • (Business requirement) • Green Jobs • Generate clean energy jobs thru use of MA renewable energy • (House 518 – Clean Jobs Act) • -Create Green IT jobs in operations and management • (Industry Best Practice) 8 8/28/2014 8
Springfield Data Center – Energy Strategy What are the key performance indicators? What target measures should we set? PUE (Power Usage Effectiveness) Ratio of watts to the building to 1 watt of electricity to the computers LEED (Leadership in Energy Eng. & Design) Industry standard certification levels based on a point scale Virtualization Ratio Number of virtual computer servers on one physical server kWh Average price per Kilo Watt Hour including delivery charges % Renewable of Electrical Supply Percentage of electrical supply from renewable energy sources 8/28/2014 9