An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deepwater Horizon Coastal Protection and Restoration Authority August 22, 2012

  2. Natural Resource Damage Assessment -- Early Restoration

  3. Lake Hermitage Marsh Creation • Lake Hermitage Marsh Creation • 104 acres marsh • Dredging for the CWPPRA portion has begun

  4. Louisiana Oyster Cultch Project • Oyster Cultch Placements • Spring 2012 • Hackberry Bay • Sister Lake • Fall 2012 • Lake Fortuna • South Black Bay • Spring 2013 • 3-Mile Bay • Drum Bay

  5. Louisiana Oyster Cultch Project - Hatchery • Oyster Hatchery Facility • Expansion of existing Louisiana Sea Grant Facility • At LDWF Marine Fisheries Lab • Projected Timeline • Designer selected – Sept. 2012 • Construction begins – Jan. 2013 • Facility completion – Spring 2014 • Operations • Broodstock maintenance • Algal cultivation • Larvae production • Nursery system

  6. “Louisiana Plan” Projects Coastal Restoration Projects

  7. Natural Resource Damage Assessment – Stages of NRDA

  8. Assessment Update • Work plans continue to be developed and implemented to assess injuries to natural resources across the Gulf. • Finalized work plans are available to the public: http://losco-dwh.com • Assessment will continue while Early Restoration planning is under way. Photo Credit: NOAA

  9. Response

  10. Outstanding Response Issues • Unilateral removal of segments from active response • Lack of long-term and proactive oil patrol and removal • Submerged oil • Lack of opportunities for parish involvement • Orphaned anchors • Premature exit from response

  11. Response Issues • OSAT III • West Timbalier Dredge Spoil • Severe Weather Activities

  12. Questions?