An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Southwest Louisiana Projects Office of Coastal Protection and Restoration

  2. Presentation Overview • Programs/Funding Sources • CWPPRA • CIAP • State Surplus • WRDA • Project Status • Recently completed • Construction phase • Design phase • Feasibility Study – Southwest Louisiana • Parish implemented CIAP projects

  3. Implemented Projects

  4. Implemented Projects

  5. Projects in Design Phase

  6. Southwest Coastal Louisiana Feasibility Study Background • Authorized under several authorities, including WRDA 2007 • Includes Calcasieu, Cameron, and Vermilion Parishes • Will utilize hydrology and other data developed for LACPR • Integrates flood control alternatives with coastal restoration measures to provide for sustainable human and natural communities • Feasibility report will include Environmental Impact Statement, Fish and Wildlife Coordination Act Report, engineering appendix, and baseline cost estimate. • Corps of Engineers and CPRA are cost-sharing partners

  7. Southwest Coastal Louisiana Feasibility Study Status • Draft PMP proposes a two phase feasibility study with Phase 1 to be completed in 6 months • Phase 1 cost = approx. $1.8 million • PMP finalization meeting scheduled for November 20 • Model Feasibility Cost Share Agreement including PMP costs ready for execution on November 21

  8. Parish Lead CIAP Projects

  9. Parish Lead CIAP Projects

  10. Questions?