1 / 16

MT Continuum Status

MT Continuum Status. Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator. 21 August 2014. Topics. MT Continuum (MTC) Overview Project Status MTC Components MTC Integration Tasks Learning Community Applicability Lessons Learned.

anisa
Download Presentation

MT Continuum Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MT Continuum Status Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator 21 August 2014

  2. Topics • MT Continuum (MTC) Overview • Project Status • MTC Components • MTC Integration Tasks • Learning Community Applicability • Lessons Learned

  3. Background Strategic Systems Programs (SSP) re-engineering Missile Technicians (MT’s) 30+ week training pipeline: Blended just-enough/just-in-time ILE-conformant content Instructor Led (ILT) and Interactive Multimedia Instruction(IMI) sections Delivered, tracked, and assessed through LMS Training via both afloat and ashore LMS’ AIM CPM and LO Module toolsets are part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms

  4. MT Continuum Team SSP - Requirements Owners, Afloat Training Capability Contractor Team – ILT development, IMI Storyboard development, SME’s NAWCTSD / AIM team - CPM/LO Module support NUWC – MTC Lead System Integrator, LMS (Seaware) LSI, Inc. – ISD and IMI design/development; integration tool development Chenega Logistics, LLC – CM/QA agent for SSP SLC –CCA for all MT curriculum Fleet – SME’s/Management of training afloat

  5. Project Status • Plan, Analyze & Design Phases Completed • Delivery Method Analysis Process still needed • Scientific/Justifiable/Repeatable • Development fully underway. Development effort is progressing on schedule • Assessment, Performance Testing (NAVEDTRA 132) • Large emphases on Implementation, Evaluation and Maintenance • Versioning, LMS interface • Ongoing integration of CPM/LO Module, IMI toolset, PC simulation toolset, and LMS for planning, analysis, design, development, implementation, evaluation, and maintenance of blended content

  6. MT ContinuumTechnical & Schedule Integration • MTC development spansfromtheJDTA’s to the delivery and maintenance of training and test assessment material to students afloat and ashore • MTC Lead System Integrator (NUWC) • Coordinates technical and schedule activities between and among developers, relative to the training and assessment delivery and maintenance goals of the MTC

  7. MT Continuum Components • Plan/Analyze • CPM (JDTA/TPP/TCCD) • Design • CPM (COI) • LO Module (final design of ILT/preliminary design of IMI) • Develop • LO Module (complete for ILT and test items) • Venus.net IMI toolset (complete for IMI and assessment Sections) • VIPr (PC simulation scenarios for ILT and IMI) • Content Packaging Tool (CPT) (provides sequencing and navigation of an AIM-based blended training solution for use in a SCORM-conformant LMS (Seaware))

  8. Content Packaging Tool (CPT) AIM Course Package (SCORM Export) LMS Content Packaging Tool (CPT) AIM ILT AIM CPT Package Staged Content IMI IMI Package Requiring Update The CPT Package provides both the runtime package for the LMS and the AIM re-ingestion package for content surveillance.

  9. MT Continuum Components(contd) • Implement • Training content includes assessment items • Seaware LMS (ILT/IMI/assessment delivery and tracking) • Evaluate • Seaware LMS (student testing /test item analysis) • Maintain • LO Module/Venus.net (integrated surveillance/update of ILT/IMI/test items)

  10. MT Continuum Integration Tasks • LMS Interfaces • Interface specification with LO Module and VIPr (JHU APL) • NUWC Newport lead with inputs from PPC (Chenega Logistics), ISD/IMI developer (LSI), and AIM team (AIMEREON) • Content Packaging Tool (CPT) • Ongoing development by LSI with support from NUWC Newport Seaware LMS team, PPC, and AIM team (AIMEREON) • Classroom Control Software (CCS)

  11. Learning Community Applicability Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development (NAVEDTRA 137) Closely coordinated with NAVEDTRA 136 development Hands-on production phase development of complete LO Module ILT lessons/sections including versioning Design of IMI lessons/sections as well as definition of new JDTA/LO Module versioning concepts Integration of PC Simulation toolset with LO Module

  12. Learning Community Applicability(contd) Bi-directional interface between LO Module and IMI toolset for integrated IMI / assessment development / maintenance Development of ILT and IMI test items and output to IMI toolset for aggregation into LMS-delivered Lesson-level assessments Sections, including enhanced performance test item development LMS delivery and tracking of integrated ILT / IMI / assessment content Integrated surveillance and maintenance environment for blended (ILT/IMI/test item) SCORM NAVEDTRA 136-compliant learning content

  13. Learning Community Applicability(contd) • Role of MT Continuum to ‘Big Navy’ future training • Training 2020 study group following MTC as one of two major prototypes under new Fleet Forces Command team leadership • OPNAV • Fleet Forces Command

  14. Lessons Learned • JDTA • Foundation. Getting this right cannot be over-emphasized. • Maturity of Design Documents and Processes • IMDP, Learning Objectives (ISD Considerations), Process Documents, Assessment Design, Time to Train Estimations, Delivery Method Analysis • Early definition of detailed blended content structure and ILT/IMI delivery implementation • Delivery interface specification • ILT/electronic classroom delivery

  15. Questions?

More Related