An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MT Continuum Status Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI 4-6 May 2010

  2. Overview • MT Continuum overview • AIM toolset role • Issues and concerns • Process flow

  3. MT Continuum Prototype Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE-conformant Instructor Led (ILT) and self-paced segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms MT Continuum team: SSP / contractors - Requirements Owners NAWCTSD / AIM team - CPM/LO Module support LSI, Inc. - ISD and self-paced content design/development

  4. AIM Tool Usage • Dedicated MT Continuum Prototype CPM and AIM I Rel 4.0 instances hosted in Orlando • Local AIM I Rel 4.0 instances running at GD-AIS Pittsfield (SMEs) and at LSI Jax (ISD/CD) • Significant progress made to date on bi-directional data exchange between LO Module and LSI Venus.net LDC authoring toolset • Excellent feedback from MT Continuum team on enhanced functionality and performance needed in CPM & LO Module

  5. AIM Tool Usage(contd) • Status: • Per GD-AIS feedback, performance-enhanced version of AIM I Rel 4.0 running locally in Pittsfield and Jax as well as on Orlando server • Per GD-AIS feedback, significant enhancements made to AIM I Rel 4.0 storyboard functions/output • Several additional enhancements recommended by GD-AIS being analyzed by AIM team for incorporation into AIM I Rel 5.0 (Jul 10 delivery) • AIM team continues troubleshooting performance and reliability issues with Orlando AIM I Rel 4.0 instance

  6. Issues/Concerns • “End to end” surveillance/maintenance test on TLO/ELO occurred to: • confirm existing change impact identification functionality in CPM and LO Module • identify near-term updates • refine longer-term enhancements • Test conducted by Mark Campbell and Mike Lueken w/ favorable results & identified critical issues to be addressed before full-rate production

  7. Modernized AIM Modernized AIM can tie the entire process together

  8. MT Continuum Process

  9. Application to Other Communities • Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development • Closely coordinated with NAVEDTRA 136 development (Mark Campbell & Jamie Stewart involved in project) • Potential “Poster Child” for ongoing NETC Continuum effort with all Centers • Integrated development and maintenance environment for blended, SCORM and 136-compliant learning content

  10. FRM Inputs on Enhancements • To be covered this afternoon during AIM/CPM Demo

  11. Questions?