1 / 10

Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe

Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe. Frank Hartmann IEKP - Universität Karlsruhe (TH). Installation. Initial positioning by laser pointer Scanning with 1mm row steps (10cm/s). P roton current: 2 m A 26 MeV protons

Download Presentation

Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe Frank Hartmann IEKP - Universität Karlsruhe (TH) Tracker Week April 2002

  2. Installation • Initial positioning by laser pointer • Scanning with 1mm row steps (10cm/s) • Proton current: 2 mA • 26 MeV protons • Irrad. of 120x120mm2 up to 1e14 p/cm2 takes 20min Tracker Week April 2002

  3. Stability of Beam Current Tracker Week April 2002

  4. Homogeneity of Scanning Scan Area Area of Interest Area cut for dosimetry Autoradiography picture Tracker Week April 2002

  5. Irradiation of Hybrid • During irradiation: Clock, Trigger (10Hz), Error Buffer Readout (1Hz), Reset • Irradiation with 2mA protons up to 2.7e14 p/cm² (~30years LHC) at RT • First qualification at cyclotron with over 5m cables and provisional readout • Hybrid is still activated (2µSv) • Result: Hybrid still alive Tracker Week April 2002

  6. Picture of Hybrid on Ni foil Area cut for dosimetry Hybrid Tracker Week April 2002

  7. Pedestal (peak) before & after After Before Tracker Week April 2002

  8. Noise (deconv) before & after After Before Tracker Week April 2002

  9. Noise (peak) before & after After Before Tracker Week April 2002

  10. Calib (deconv) before & after After Calibration: only first shot! Still working! To be further investigated in the lab! Before Tracker Week April 2002

More Related