TSA Implementation in Nepal Under SPFM Project. TSA Unit, FCGO. outline of presentation. TSA component under SPFM project Financial status major achievements current affairs challenges and way forward. Financing under SPFM Project. Component 1:
E N D
TSA Implementation in Nepal Under SPFM Project TSA Unit, FCGO
outline of presentation • TSA component under SPFM project • Financial status • major achievements • current affairs • challenges and way forward
Financing under SPFM Project Component 1: Implementation of Treasury Single Account (TSA) System
Sub Component : 1.1 Providing support for up-grading the technological infrastructure to set up the Core Treasury System 1.2 Providing support for further enhancement of the information systems as presently configured. 1.3 Technical Maintenance and support for the Systems 1.4 Provide support for rolling out the TSA to the remaining districts 1.5 Training
Budget & Expenditure Status Total budget for the component GoN US $ 1.0 m MDTF US $ 2.8 m Total US $ 3.8 m Total Expenditure: NRs.(up to FY 2068/69) Central level :54,239,232.00 District level :42,255,954.10 Total :96,495,177.10 (equivalent in US$ 1,109,140)
Budget & Expenditure Status.....cont. Budget approved for FY 2012/13: NRs Recurrent : 17,500,000.00 Capital : 62,850,000.00 Total : 80,350,000.00 Additional Budget proposed to MOF Recurrent : 42,100,000.00 Grand total : 122,450,000.00 (Equivalent US$ : 1,407,471.26)
Major Achievements • TSA Rolled out in 60 Districts(covering more than 97 % transactions of receipts and 95 % of payments); • Aggregate fiscal position is known daily(60 districts) • Approximately 3,400 SUs out of a total of 4,500 SUs have been covered under TSA • Approximately 12,517 out of 14,000 bank accounts have been closed
Major Achievements........cont. • All 60 Districts have been connected with FCGO through Online system • Out of 60 Districts, 20 Districts have been connected through Optical Fiber and rest of Districts have connected through ADSL line. • Data Center (DC)having two high-configured servers with required accessories established in FCGO • Data Recovery (DR) Center having one high-configured server with required accessories established in GIDC
Major Achievements........cont. • Approximately 3,760 employees including office chiefs, account chiefs, bank and DTCOs staffs have been oriented and trained. • In comparison with FY 2009/10, in FY 2010/11, GoN paid approximately NRs 20 million less to the NEPAL RATRA BANK as bank commission. • Hardware facilities have been upgraded.
Major Achievements........cont. • DTCO staffs are better aware of the professional aspects • Improved Fiscal discipline in DTCO and SU • SU’s work simplified • Ad hoc query and tailor made reports will be possible to generate • Cash requirement forecast data is available
Current Affairs • Rolled out in 15 Districts from the next FY 2070/71 • Installation of devices for digital security in DR Center • 38 TSA districts has been monitored and it's results are found to be encouraging • Performance based pay for DTCO staff is under consideration in MOF • Directives for financing on TSA is drafted and to be ready for implementation
Challenges and Way Forward • Total public sector data not available • Capacity needs to be strengthened • SU- level computerization still awaited • Bank reconciliation needs strengthening (banks doing govt.transactions have no compatible software with TSA System)
Challenges and Way Forward ...cont. • Transactions other than budget book are not mapped • e-Payments not possible due to lack of system and digital signatures • core functionality of TSA is still ahead • Failure of Power Supply( Increasing load shading up to 14 hours in a day) • Interface with banks and SUs is needed