• 400 likes • 544 Views
CINEMA Mechanical Team Summer 2010. Jerry Kim University of California, Berkeley Space Sciences Laboratory. Outline. Introduction/Previous Assignments Current Assignments Chassis Avionics Stack UHF/Whip Antenna Harnessing Misc. Summary/Future Assignments. Intro/Previous Assignments.
E N D
CINEMAMechanical TeamSummer 2010 Jerry Kim University of California, Berkeley Space Sciences Laboratory
Outline • Introduction/Previous Assignments • Current Assignments • Chassis • Avionics Stack • UHF/Whip Antenna • Harnessing • Misc. • Summary/Future Assignments
Intro/Previous Assignments CINEMA Mag Side Dec. 2009 CINEMA Mag Side Aug. 2010
Intro/Previous Assignments CINEMA STEIN side Dec. 2009 CINEMA STEIN side Aug. 2010
Chassis (CubeSat Specs) Credit: CubeSat Design Specification Rev. 12, The CubeSat Program, Cal Poly SLO
Chassis (Assembly) Mock-Up Model (Aug. 2010) Flight Model (Aug. 2010)
Chassis (Top) Mock-Up Model (Jan 2010) Mock-Up Model (Aug. 2010)
Chassis (Bottom & Sides) Mock-Up Model (Jan. 2010) Mock-Up Model (Aug. 2010)
Chassis (End-Plate [+y]) Mock-Up Model (Jan. 2010) Mock-Up Model (Aug. 2010)
Chassis (End-Plate [-y]) Mock-Up Model (Jan. 2010) Mock-Up Model (Aug. 2010)
Chassis (Issues) Rail Cutouts Recessed End-Plate
Chassis (Issues) cont. Rail Screws Top/Bottom & Sides Joint
Avionics Stack (Assembly) Previous Model Current Model (Aug. 2010)
UHF/Whip Antenna (Issues) SMB to Antenna Connection Vibration Test Failure
Harnessing (Issues) VS. T-Splitter Straight Splitter
Harnessing (Issues) Patch Antenna UHF Splitter
Misc. cont. Deploy Switch L-Bracket UHF Antenna Chassis U-Channel
Summary/Future Assignments • Chassis • Fabricate Mock-Up (by 1st week of Sept.) • Assembly → Fit Check • Avionics Stack • Assembly • UHF/Whip Antenna • Drawings → Fabrication • Harnessing • Locate Patch Antennas & UHF Splitter • Solar Panel to Linear EPS