1 / 27

As of 09/2004

Hey man this is fun and y. As of 09/2004. SIRIUS Motor Management. SIMOCODE pro. This is cool and I think this just. This is cool and I think this just. As of 09/2004. What is SIMOCODE pro?. Data, Date, Date etc…. Market Position. I/O. Networking. RTD & NTC. Temp. Power. Local.

cooper-cruz
Download Presentation

As of 09/2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hey man this is fun and y As of 09/2004

  2. SIRIUS Motor Management SIMOCODE pro This is cool and I think this just This is cool and I think this just As of 09/2004

  3. What is SIMOCODE pro? Data, Date, Date etc… Market Position I/O Networking RTD & NTC Temp Power Local Logic Profiles Monitoring IT SIMOCODE MM3 Motor Logic Plus II E3 Plus

  4. What is SIMOCODE pro? • SIMOCODE pro is a configurable electronic overload relay: • Has 18 motor application profiles including (FVNR, FVR, Star-delta, two speed etc…) • Is a slave on a Profibus DP network for remote monitoring and control • Has built-in I/O (analog, digital, earth fault and temperature) • Has built-in programmable logic (truth tables, timers, counters, etc…) • Power Monitoring – Power Factor Market Position

  5. What is SIMOCODE pro? Market Position 4DI / 4DO 4AI / 1AO LOGO 8DI / 4DO 3RB12 Profibus RTD Thermistor 9200

  6. What is SIMOCODE pro? Market Position

  7. What is SIMOCODE pro? Market Position SIMOCODE

  8. Target Application Application that is controlling and protecting a motor. • Requirements for OEM • Micro PLC Logic • Analog, Digital and Temperature I/O • Configurable Overload • Network Capable • Requirements for End User / Consulting Engineer • Data, Data, Data etc… • Local control in case network goes down • Identify problems before failures occur • Reduce Engineering Time Market Position

  9. Auto Disc OL M PLC Input PLC Input PLC Input PLC Input Motor Current PLC Input Traditional FVNR with HOA Market Position START H O A STOP OL M M PLC Output

  10. West Chicago works with Consulting Firm Market Position

  11. West Chicago works with Consulting Firm Market Position SIMOCODE input SIMOCODE-DP With SIMOCODE-DP, all motor related I/O is relocated to the MCC unit, reducing field wiring. SIMOCODE status bit SIMOCODE input SIMOCODE-DP SIMOCODE input SIMOCODE status bit SIMOCODE status bit SIMOCODE output Move fuse to MCC unit (when required) SIMOCODE input Wire to MCC unit (when required)

  12. West Chicago works with Consulting Firm Market Position SIMOCODE-DP

  13. Standard Applications Market Position Air Handling Pumps Conveyor belts Compressors

  14. Customer Application Example “While conventional systems only show the cycle time, and whether the system is in run or fault, the Siemens motor management system shows much more. It transmits actual motor current, motor direction, phase status and overload status back to the PLC.” Market Position “This was a major benefit for us, you can monitor a lot more detail on the motor status than you can on a conventional control system. For example, if the current starts to get too high, the customer can perform proactive preventive maintenance before the blower shuts down.” Sandeep Shah Director of Technology Clyde Bergemann

  15. Standard Applications Market Position Fans Mixers Stone-crusher mills Milling machines

  16. Customer Application Example Below the main operator deck at APAC Arkhola are the motor control centers, all integrated into the TC-2000 with Siemens SimoCode intelligent motor controllers. All of the SimoCode devices are connected to the TC-2000 via PROFIBUS which allows the operators to see data such as; the number of starts, trips, trip current, hours of operation. The SimoCode devices have integrated functionality that allows them to be operated locally without the need of a supervisory controller, such as a PLC.” Market Position Mark Harned Vice President, Controls ASTEC Industries

  17. Generating Customer Interest! • Increase productivity by providing enough data to prevent shutdown instead of just why it shutdown? • Save component/installation costs by combing functionality into one unit? • Do they require local control if the network is down? • Does local control require logic such as timers or counters? • Are there digital / analog / temperature signals nearby that are connected to standard fieldbus I/O? • Reduce maintenance time with removable terminals, separate CT and memory module for quick software configuration? • Do you test for a no load condition (broken conveyor belt) as well as an overload condition Market Position

  18. SIRIUS Motor Management SIRIUS Motor Management SIMOCODE pro This is cool and I think this just This is cool and I think this just

  19. Current Measuring Module Basic Unit 1 4 I / 3 O binary Thermistor PROFIBUS-DP 24 V DC / 110 – 240 V UC 0.3 A – 630 A Straight-through/ busbar connection technology Connection Cable Operator Panel 5 buttons / 10 LEDs In various lengths (up to 2 m) The Components SIMOCODE pro C – Compact Components

  20. Expansion modules • 4I / 2O x binary • 2I / 1O x 0/4 – 20 mA • 3 x sensors Pt100/ Pt1000 • External earth fault via summation current transformer The Components SIMOCODE pro V – Variable Basic Unit 2 Current Measuring Module 4 I / 3 O binary Thermistor PROFIBUS-DP 24 V DC / 110 – 240 V UC 0.3 A – 630 A Straight-through/ busbar connection technology Components Connection Cable In various lengths (up to 2 m) Operator Panel 5 buttons / 10 LEDs Current/VoltageMeasuring Module 0.3 A – 630 A / 690 V Straight-through/ busbar connection technology

  21. The Components Small auxiliary equipment with large time-saving potentials. Addressing Plugfor assignment of PROFIBUS address without PG/ PC Assignment of a PROFIBUS address to one or several basic units within seconds. Components Memory Modulefor parameterization without PG/ PC Commissioning of a motor feeder within seconds.

  22. The Current Ranges Current Measuring Modules for all motor currents Widths: 45 mm 55 mm 120 mm 145 mm Components 0.3 – 3 A 2.4 – 25 A 10 – 100 A 20 – 200 A 63 – 630 A * Straight-through transformer Busbar connection * With 3UF18 intermediate transformers up to 820 A

  23. The Voltage Range Current/Voltage Measuring Modules Widths 45 mm 55 mm 120 mm 145 mm Components 0.3 – 3 A 2.4 – 25 A / 690 V 10 – 100 A / 690 V 20 – 200 A / 690 V 63 – 630 A*) / 690 V Straight-through transformer Busbar connection *) With 3UF18 intermediate transformers up to 820 A

  24. SIRIUS Motor Management SIRIUS Motor Management SIMOCODE pro This is cool and I think this just This is cool and I think this just

  25. Configuration software: SIMOCODE ES optionally with “SIMOCODE ES Graphic”graphic editor 3UF50 compatibility mode at the PROFIBUS-DP SIMOCODE-DP Converter: Conversion of “old” parameter files into SIMOCODE ES parameter files Integration & Configuration In any automation system. • As with SIMOCODE-DP and with compatibility mode Totally Integrated Other systems SIMATIC S7 PCS7 PROFIBUS-DP Integration SIMOCODE pro

  26. SIMOCODE ES • SIMOCODE ES Smart • Basic Parameterization Package • SIMOCODE ES Professional • Profibus Communications • Converter • Win SIMOCODE DP to SIMOCODE ES • Graphic • Graphical Representation Package • PCS7 ES • Engineering Software Package • PCS7 RT • Runtime Package Integration

  27. Hey man this is fun and y As of 09/2004

More Related