XYZ Port FacilityMaritime Security Drill Briefing for Controllers date
Evacuation Emergency Response – Contingencies Drill D423
Scope • Date, time, location • Aim • Objectives • Desired outcomes • Controllers • Players • Materials • Scenario • Master Events List • Controller Tasks • Communications • Safety • Debrief
Drill number: X/XX Date: Start Time: Location: Estimated End Time:
Aim To enhance the proficiency of security staff in evacuating the port facility when ordered.
Objectives • Port facility staff will be required to conduct evacuation according to the procedure and requirement in the PFSP.
Desired outcomes • Staff will be able to: • Prepare the port facility for evacuation. • Carry out evacuation properly and expeditiously.
Control Team • Chief Controller: Safety Manager, Mr. AAA • Controllers Reps from Ops Dept – Mr. XXX Reps from companies in the building Others as required
Players • PFSO • Port facility security staff • Port facility operations staff • Building occupants
Materials • Emergency warning system to be in working condition
Scenario A bomb threat has been declared in the and the building has been ordered to be evacuated.
Controller Tasks • Chief Controller will initiate the drill • Assist in the orderly evacuation of the occupants
Communications • Mobile phone • Walkie-Talkie • Player – Ch YY • Controllers – Ch ZZ
Safety • Physical safety of personnel is paramount • Please walk calmly and quickly to the nearest exit and proceed to designated assembly point • Do not use the lifts • No pushing • Take care when walking down stairs.
Debrief • Location: • Secretary: • Attendance