1 / 5

Prototype Installation in Ferrara and plans for cosmic run

This document provides updates on the installation and testing of the prototype in Ferrara, including ongoing data analysis and future plans for cosmic data taking. It also outlines the preparations for the next test beam and improvements to the DAQ system.

donmoyer
Download Presentation

Prototype Installation in Ferrara and plans for cosmic run

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prototype Installation in Ferrara and plans for cosmic run W. Baldini on behalf of the Ferrara SuperB Group XVI SuperB General Meeting, LNF Apr.04-07 2011

  2. The testbeam @ Fermilab • The prototype was tested on beam at Fermilab on Dec. 1-7 2010 at the Fermilab Test Beam Facility (FBTF) • Data Analysis is ongoing (see Gigi’s talk) and first results are encouraging • Few things to be better understood though (i.e. strange behaviour of PB 1&2 • In February all pizza boxes have been shipped back to Ferrara • Re-assembling is finished and the DAQ is being restarted (not so trivial…)

  3. DAQ-Man Prototype installation in Ferrara • The prototype is now installed and re-connected in Ferrara • The configuration is the same as in Fermilab: • Same Pizza Box configuration (CP1 now) • Distances among PB are the same as in the prototype • No Iron • DAQ setting up under way • The plan is: • Restart everything exactly as it was at Fermilab • Use a stable configuration to take cosmics overnight • During the day make changes/improvements in order to optimize the system for the next test beam Pizza Boxes

  4. Plans for cosmic data taking • We plan to take cosmic data overnight • At the very beginning triggering with the upper and lower-most layers, mainly for debugging purposes • As soon as we reach a stable condition, switch to an external scintillator trigger and measure: • Efficiency and time resolution for different SiPM bias voltages (to understand a strange behaviour of some PB @ the testbeam) • Number of p.e./mip for the different combinations of scintillator-fibers-SiPM (at the testbeam not enough time…) • Test the special module with MPPC (not tested at the Dic. testbeam) • Comparison with testbeam data

  5. Preparation for the next testbeam • Understand Dec. testbeam issues (e.g SiPM bias), • Improve/test as much as possible the DAQ with cosmics • Exploit the previous experience to optimize the next data taking: • Cerenkov cables: prepare 75W 50W adapters • larger S3,S4 scintillator (?) • Faster S1-S2 scintillator (or use the TOF) • …. Other?? • Cerenkov gas: check if the bottle is still full • Organize the expedition well in advance.. (>3weeks)

More Related