1 / 10

Parts Critical Design Review Jorg Fischer University of California - Berkeley

Parts Critical Design Review Jorg Fischer University of California - Berkeley. Overview. Parts & Materials Overview Requirements EEE Parts ID List Procurement Parts Status. Requirements & Specs. GSFC 311-INST-001A Instructions for EEE Parts Selection, Screening, Qualification

fallon
Download Presentation

Parts Critical Design Review Jorg Fischer University of California - Berkeley

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Parts • Critical Design Review • Jorg Fischer • University of California - Berkeley

  2. Overview Parts & Materials Overview • Requirements • EEE Parts ID List • Procurement • Parts Status

  3. Requirements & Specs • GSFC 311-INST-001A • Instructions for EEE Parts Selection, Screening, Qualification • Parts in compliance with 311-INST-001A, Level 3 • Use of GSFC PPL 21 (GSFC Preferred Parts List), design permitting • Plastic Encapsulated Microcircuits (PEM) Selection, Screening, and Qualification (PEM-INST-001A) • PIND per MIL-STD-750 and MIL-STD883, required for cavity devises • 41 line items of military part types will be PIND tested

  4. Requirements & Specs • (continued) • DPA Test • Completed for 23 line items • Test pending for one line item(PT100-C416) • Radiation Testing • Total Ionizing Dose Requirement is 66Krads (si) Cobalt 60, • - Verified byGSFC, JPL, or manufacturer • - Verified byTID testing • SEE use existing data or historical use (similarity) • - Used demonstrated technology hardness/latchup immune devices • - Verified byGSFC, JPL, or manufacturer • - Two parts to be tested (MIC4425, OP462 in RFQ process)

  5. Requirements & Specs • Parts Control Board (PCB) • PCB members are: Themis QA, Design Engineer, and Themis Project manager, or representative • PCB shall review EEE part for: • Testing, Screening, and Qualification Failures • Alerts (e.g., GIDEP)

  6. EEE Parts ID List • UCB/SSL QA will maintain an EEE Parts • Identification List (PIL) • The PIL will contain: • Manufacturer’s generic part number • Military Part Number or SCD number • Manufacturer(s) • Where used (unique assembly) / Quantity • Quantity used • Quantity ordered • Lot/Date Code • Radiation Status (TID/SEL) • Alert Status • Comments

  7. Parts Status Parts Test Status Summary and Tracking (continued) Parts List Materials List

  8. Parts Status • Active Parts Status (4/15/04) • 86 Line Items • 65 Line Items In Stock • 21 Line Items due at UCB in 2nd quarter ‘04 • Parts Tests • All Line Items meet TID requirements • 84 Line Items meet SEE requirements • 2 parts to be SEE tested • 85 Line Items meet DAP requirements • 1 Line Item to be DAP tested

  9. Parts Status • ESA • Active Parts Status (4/15/04) • 19 Line Items • 12 Line Items In Stock • 7 Line Items due at UCB in 2nd quarter ‘04 • (1 Line Item at screening AD5544) • SST-DAP • Active Parts Status (4/15/04) • 18 Line Items • 15 Line Items In Stock • 3 Line Items due at UCB in 2nd quarter ‘04 • (6 Line Item at screening • AD5544, LTC1604, OP462, MAX907, • 2N6519, CA3080)

  10. Parts Status • EFI • Active Parts Status (4/15/04) • 3 Line Items • 3 Line Items In Stock • 0 Line Items due at UCB in 2nd quarter ‘04 • (1 Line Item PIND Test pending OP15AJ/883) • IDPU • Active Parts Status (4/15/04) • 59 Line Items • 48 Line Items In Stock • 11 Line Items due at UCB in 2nd quarter ‘04 • (3 Line Items at screening • AD5544, LTC1604, PT100-C416)

More Related