K-6 Building Task Force April 16, 2009
Members of the Task Force Bachinski, Cathy Barnett, Jessica Bates, Elizabeth Beckelic, Scott Binkley, Rebecca Blosser, Cheryl Browning, Tammi Hack, Beth Hildreth, Jeanette Hodack, Judy Jackson, Angie Jackson, Larry McDaniel, Dawn Woodliff, Dustin Wogaman, Trina
Goal • Make a recommendation as to where the Birth-to-Five(B-5)/K-6 instructional programs should be housed.
The Process • Identify the building requirements for the current B-5/K-6 programs • Identify the building usage requirements for the 7 – 8 grade extracurricular activities
The Process (cont.) • Determine the feasibility/cost to convert/modify the Junior High to accommodate these programs • Determine the feasibility/cost to convert/modify Barhitte to accommodate these programs
The Process (cont.) • Develop Driving Forces and Detracting Forces for each option • Create a consensus about which option is the best for the District
Building Requirements • The B-5/K-6 instructional programs require 27 classrooms. • The after school programs run until 4:45 pm
7-8 Grade Extracurricular • Middle School Practice in Gym & Café Begins @ 3:00 p.m. – 8:00 pm • Middle School athletic events start at 4:00 pm
Junior High Building • Currently has 18 classrooms in the building and one portable that is used for Special Services • Has a gym and a stage
JH Additional Requirements • 9 additional classrooms • Modify a restroom • Size appropriate playground
JH Additional Needs • Convert Library to two classrooms • Move Library to Tech Lab • Modify a restroom • Buy Portables • Build playground
Disclaimer • The following figures are used for comparison purposes only, the actual cost will not be known unless the projects are competitively bid out. There are many variables that could alter the final cost. These figures were obtained by quotes over the phone and from our maintenance staff.
Estimated Cost to Modify JH • Convert Library to classrooms and Tech Lab to Library $4,500 - $5,000 • Modify a restroom $3,600 - $4,000 • Portables @ $100,000 - $150,000 a piece
Estimated Cost to Modify JH • 5 - 6 portables $500,000 - $900,000 • Used portables installed $50,000 • 5 - 6 used portables $250,000 - $300,000
Estimated Cost to Modify JH • Playground $100,000 - $150,000
Total Estimated Cost for JH • With New Portables • $608,100 - $1,059,000 • With Used Portables • $358,100 - $459,000
Barhitte Elementary • Currently has 18 classrooms inside • 9 portable units • Total of 27 classrooms • Has a gym suitable for that level • Has a playground suitable for that level
Additional Requirements for Barhitte • Repair and upgrade portables • The existing building would not need any modifications • This does not include any routine maintenance for either the JH/Barhitte buildings
Estimated Costs for Barhitte • Baseline needs $7,800 • Individual needs $7,850 • Possible Upgrading $8,550 • Total $24,200
Force Field • Junior High • Driving Forces • Detracting Forces • Barhitte • Driving Forces • Detracting Forces
Thank You Thank you for the time and effort that you have put into this. Your dedication and interest in Bentley Community Schools is greatly appreciated.