WELCOME TO THE 2006 JPA PLANNING COMMITTEE MEETING. INTRODUCTIONS. JPA AGENDA. Welcome/Introductions Power Marketing Updates (Oretta) PD Remarketing O&M Contracts Meter Testing Program (Radosevich) Short Circuit Working Group Update (Field) OATT NOPR Update (Moulton)
E N D
WELCOME TO THE 2006 JPA PLANNING COMMITTEE MEETING
JPA AGENDA • Welcome/Introductions • Power Marketing Updates (Oretta) • PD Remarketing • O&M Contracts • Meter Testing Program (Radosevich) • Short Circuit Working Group Update (Field) • OATT NOPR Update (Moulton) • POISE Update (Steward) • 10 Year Studies & Maintenance/Construction Program (Johnston & Radosevich) • Right-of-Way Studies & Standards (Radosevich) • JPA 2006-2007 Goals (Moulton) • Next Meeting • Action Items
POWER MARKETING UPDATES MARY ORETTA (602) 605-2639 oretta@wapa.gov
POWER MARKETING UPDATES • PD Remarketing • O&M Contracts
METER TESTING PROGRAM DAVID RADOSEVICH (602) 605-2605 RADOSEV@wapa.gov
Western’s Integrated Meter Validation Program • Old procedure (standard) is to remove meter from service and bench test to provide an accurate validation of the meter • New procedure being established provides an accurate validation and is preferred because: 1) Does not interrupt power metering or billing 2) Performed faster (costs less to do) 3) Same degree of accuracy 4) Meter is not removed from service 5) Validates meter under actual load conditions
Integrated Meter Validation Procedure • New procedure utilizes an RD-33 reference standard to validate the accuracy of the revenue meter while still in service 1) It measures the actual voltage and current applied to the meter to calculate power 2) It also monitors the KYZ pulse output of the meter 3) It then compares the calculated MW to the pulses received, providing a percent error based on this comparison
Integrated Meter Validation Procedure • Accuracy of the In-service Validation Test is the same as the bench test, since they both use the RD-33 • While the in-service validation is a single test, the bench test consists of several independent tests: 1) All four quadrants (Watts Fwd, Watts Rev, VARS Fwd, VARS Rev) are tested in a bench test 2) In each quadrant, three tests are performed: Full Load (5A) at Unity PF Light Load (0.5A) at Unity PF Full Load (5A) at 0.5 PF
Integrated Meter Validation Procedure • Since the MW load and power factor vary from line to line, the maximum acceptable error for the in-service validation is set to the maximum error allowed in the bench test, 0.3% • If the in-service validation fails to meet this tolerance requirement, a full bench test shall be conducted on the meter • If the loading on the line is insufficient to perform an in-service validation test, a bench test is performed
Integrated Meter Validation Procedure QUESTIONS??
SHORT CIRCUIT WORKING GROUP TOM FIELD (602) 605-2517 field@wapa.gov
JPA SWAT Short Circuit Study Group Update July 12, 2006 Phoenix, AZ
Short Circuit Work affects System Reliability • Relay Misoperations – Fail to Operate or Operate When They Shouldn’t • Equipment Damage due to Failure to Operate Relays • Circuit Breakers and Other Equipment Failure because not Properly Rated
Power System Operational Reliability • Correct Relay Operation • Correct Breaker Ratings • Reliability Depends on Accurate Fault Current Calculations
Reasons to Form Regional Short Circuit Working Group • The interconnected system requires cooperation between everyone for accurate short circuit data • There was no formalized mechanism in place by WECC or other Arizona regional groups for coordination of the short circuit case
4 Main Areas of Work • Annual Operating Case • Common Impedance Maps • Common Study Methodologies • Annual Standards Review
Annual Short Circuit Operating Case • Improved Short Circuit Data for Relay Settings • Improved Short Circuit Data for Breaker Duty Evaluations • Improved Short Circuit Data for Safety Grounding and Arc Flash Evaluation • Improved Reliability of System Operation and Safety of Maintenance Personnel
Common Impedance Maps • Useful for seeing Short Circuit Case and Planning Case Updates • One set of maps reduces duplication of effort • Easy to make changes for annual operating case by marking drawings
Common Methodologies • One set of breaker methodologies chosen for the jointly owned stations • Other methods, such as safety grounding, etc. developed as guidelines • Information sharing forum
Annual Standards Review • Breaker Duty Studies, TRV Studies, Switching Studies, and Safety Grounding Studies based on standards • Standards can change without a change in study methodologies • Annual review of standards changes to determine if study methodology changes required
SWAT SCWG Accomplishments • Webpage setup and linked to SWAT Website • Charter (Scope) Finalized • All SWAT Transmission Owners joined • 6 meetings held since starting in January • Monthly meeting schedule • Impedance Map Plan Developed • Working on Combining First Case
Impedance Maps Work • Most Impedance Maps Are Out of Date • List of Items to be Placed On Maps Developed • A Single Set of Impedance Maps to be Generated • Requested SWAT to Develop WestConnect Funding of Impedance Map Generation • Only 2 WestConnect Members not Members of SWAT SCWG
Combined Case • Plan Developed • Conversions Currently being Checked • Zones for Members being Developed • Equivalents to be Checked • Cases to be Combined
Future Work • Combine CCPG SCWG Case • Combine STEP SCWG Case (if developed) • Develop Common Methodologies • Review of Standards • Start on next Annual Case and Impedance Maps Update (refinements)
Future Refinements • Add Mutual Coupling • Add Line Charging Capacitance • Add Motors • Check Transformer, Line, Shunt, Generator, and Load Data
OATT NOPR UPDATE RONALD MOULTON (602) 605-2668 moulton@wapa.gov
NOPR TIMELINE FOR FILING • Notice of Proposed Rulemaking (NOPR) was issued 5-18-06 • OATT NOPR Comments/Compliance Filing Team was formed 6-1-06 • Charter drafted 6-8-06 • Conference Call 6-8-06 to determine issues for response and develop Western’s approach • Regional representatives submit input to the team by COB 6-16-06 • Technical and Legal Team Leads compile input into first draft response by 6-30-06 • Review by Team representatives by COB 7-7-06
NOPR TIMELINE (cont’d) • Technical and Legal Team Leads compile second draft for review by PSOC by COB 7-12-06 • PSOC review completed by 7-17-06 and coordinated with BPA • Team representatives respond to PSOC comments by COB 7-24-06 • Final draft response to DOE’s General Counsel for review by COB 7-26-06 • DOE’s General Counsel review completed by 8-2-06 • Western will submit the completed response to FERC by COB 8-7-06
TOP ISSUES • Transmission Planning • Imbalance Pricing • Capacity Reassignment • Redispatch Service • Conditional Firm Service • Hourly Firm Service • Reservation Priority • Secondary Network Service
POISE UPDATE JOHN STEWARD (602) 605-2774 steward@wapa.gov
JPA Meeting 2006 • What is POISE? • Current Scheduling System • Future Scheduling System • OASIS Customer Support POISE / OASIS
JPA Meeting 2006 POISE / OASIS • What is POISE? P – Power O – Operations I – Integrated S – Systems E - Environment • Groups Comprising POISE • - Information Technology • Interchange Scheduling • Transmission Planning & Industry Restructuring • Reliability Generation • Load and Resources
JPA Meeting 2006 Customer Submit E-Tag Transmission Request E-Tag OASIS Current Scheduling System Limited Validation Manual Process After Tag is Implemented It becomes a schedule • Effects • No Communication From OASIS to E-Tag and Scheduling to OASIS • Manual Processes In Place Scheduling
JPA Meeting 2006 Customer Submit E-Tag Transmission Request E-Tag OASIS POISE Scheduling System Full Validation Potential to Automate Process Send Approved Tags to Scheduling System • Effects • Communications amongst all three systems • Automate some processes • Increase Non-Firm ATC • Industry Standardization Scheduling Send Schedule Data Increase Non-Firm ATC
JPA Meeting 2006 POISE / OASIS • Effective date • The date of implementation is December 1, 2006 • Who will be impacted • This will have an impact on OATT customers • Issues • There are still many open issues that need to be decided
JPA Meeting 2006 • OASIS/OATT Customer Support • Open Access Transmission Tariff • Questions and “What If” Scenarios • Please contact: • John Steward • Email: steward@wapa.gov • Phone: (602) 605-2774 • OR • Nancy Whitson • Email: nwhitson@wapa.gov • Phone: (602) 605-2667 POISE / OASIS
JPA Meeting 2006POISE / OASIS QUESTIONS ?????
10 YEAR STUDIES & MAINTENANCE/ CONSTRUCTION PROGRAM JOSHUA JOHNSTON & DAVID RADOSEVICH (602) 605-2634 jjohnston@wapa.gov (602) 605-2608 RADOSEV@wapa.gov
10 YEAR STUDIES & MAINTENANCE/CONSTRUCTION PROGRAM • Northwest Region (South of Mead) • Load Serving Capabilities (Johnston) • Maintenance/Construction Program (Radosevich) • Questions • Central Region (South of Phoenix) • Load Serving Capabilities (Johnston) • Maintenance/Construction Program (Radosevich) • Questions
Ten Year Study • Analyze the existing construction ten year plan using engineering planning criteria • Analysis will aid in prioritizing future proposed construction projects • Results may re-shape existing construction plan • Results will approximate each proposed project in potential increased MW to Western’s system capabilities