1 / 8

ROAD PAVEMENT FORUM MAY 2007

Recycling . Energy consumption of recycled asphalt layers can be as little as 25% of that needed for new layers. Ever increasing cost of fuel, bitumen and aggregates should result in the cost of recycled pavements rising at a much slower rate than that for virgin materialRoad owners utilising mater

harsha
Download Presentation

ROAD PAVEMENT FORUM MAY 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. ROAD PAVEMENT FORUM MAY 2007 ASPHALT RECYCLING

    2. Recycling Energy consumption of recycled asphalt layers can be as little as 25% of that needed for new layers

More Related