TIEDOTUSTILAISUUS 29.1.2012 TAKAMAAN KOULU. Vahantajoen vesihuolto-osuuskunta Mikkolantie 13 B, 33470 Ylöjärvi www.vahantajoki.fi , vahantajoki@vahantajoki.fi. NYKYTILA VASTAMÄKI-LAKIALA. VALITUS KAUPUNGIN PÄÄTÖKSESTÄ VAHVIS-TAA MEIDÄN TOIMINTA-ALUE ON KHO:SSA

hien
Download Presentation

TIEDOTUSTILAISUUS 29.1.2012 TAKAMAAN KOULU

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TIEDOTUSTILAISUUS 29.1.2012TAKAMAAN KOULU Vahantajoen vesihuolto-osuuskunta Mikkolantie 13 B, 33470 Ylöjärvi www.vahantajoki.fi, vahantajoki@vahantajoki.fi

  2. NYKYTILA VASTAMÄKI-LAKIALA • VALITUS KAUPUNGIN PÄÄTÖKSESTÄ VAHVIS-TAA MEIDÄN TOIMINTA-ALUE ON KHO:SSA • VASTAMÄKI-TAKAMAA -TAAJAMAT: MEILLÄ EI VAHVISTETTUA TOIMINTA-ALUETTA • MEILLÄ EI RAKENTAMISVELVOITETTA • VOIMASSA HAJA-ASUTUSALUEEN JÄTEVESILAKI (TULKINTA A.TIAINEN 28.1.-12)

  3. LIITTYMISESTÄ VIEMÄRIIN • OSUUSKUNTA TOTEUTTAA KAUPUNGIN JÄRJESTÄMISVELVOITETTA. • ELY-KESKUKSEN MÄÄRITTELEMÄT TAAJAMAT: • VASTAMÄKI • VANHANKOULUNTIEN ALKUPÄÄ (vesiosk rajapinta) • TAKAMAA KYLÄT: • VANHANKOULUNTIEN POHJOISPÄÄ • KILPIJOENTIEN LOPPUPÄÄN UUDISRAKENNUSALUE

  4. YLEISESTI • ELY-KESKUKSEN VESIHUOLTOAVUSTUS SEKÄ KAUPUNGIN SIIRTOVIEMÄRIIN ETTÄ OSUUSKUNNAN SISÄISEEN VERKOSTON RAKENTAMISEEN • YLÖJÄRVEN VESI LIIKELAITOS TAI NYKYINEN VESIOSUUSKUNTA ON EDELLEEN TALOUSVEDEN TOIMITTAJA • OSA VESIOSUUSKUNNISTA ON SULAUTUMASSA SEURAAVIEN VUOSIEN AIKANA VAHANTAJOEN VESIHUOLTO-OSUUSKUNTAAN

  5. TONTTIJOHDOT • OSUUSKUNTA RAKENTAA VERKOSTON TONTIN RAJALLE, TUO PUTKET JA MAHDOLLISEN PUMPPAAMON KIINTEISTÖLLE • KIINTEISTÖNOMISTAJALLE JÄÄ TONTILLA TAPAHTUVA RAKENTAMINEN JA SÄHKÖN TUONTI PUMPPAAMOLLE • USEAMMAN KIINTEISTÖN YHTEISEN PUMPPAAMON SÄHKÖ MITATAAN VÄLIMITTARILLA • OSUUSKUNTA KILPAILUTTAA TONTTIJOHOJEN TEKEMISEN, JA KIINTEISTÖNOMISTAJA VOI VALITA JOKO KILPAILUTETUN TAI JONKUN MUUN URAKOIT-SIJAN

  6. LIITTYMISMAKSU • LIITTYMISMAKSU VIEMÄRIIN ON OSUUSKUNNAN JÄSENILLE 8 500 € • LIITTYMISMAKSU VIEMÄRIIN EI-JÄSENILLE 1,5 X 8 500 € • LIITTYMISMAKSU MUODOSTUU: + RAKENTAMISKUSTANNUKSISTA + KAUPUNGIN VELOITTAMASTA SIIRTOVIEMÄRIN RAKEN- TAMISESTA AIHEUTUVISTA KULUISTA, 1850 € - VESIHUOLTOAVUSTUS - n. 20 % RAKENTAMISKUS- TANNUKSISTA - KAUPUNGIN RAKENTAMISAVUSTUS -15 % RAKENTA- MISKUSTANNUKSISTA

  7. LIITTYMISMAKSUN MAKSAMINEN • LIITTYMISMAKSUN VOI MAKSAA JOKO KERRALLA TAI NELJÄSSÄ ERÄSSÄ • OSK VOI NEUVOTELLA MYÖS MUUSTA MAKSUJÄRJESTELYSTÄ • YLÖJÄRVEN AITO SÄÄSTÖPANKKI SEKÄ OSUUSPANKKI OVAT HALUKKAITA NEUVOTTELEMAAN LIITTYMISMAKSUIHIN TARVITTAVASTA LAINOITUKSESTA OSANA ASUNTOLAINAA • VANHEMMAN VÄESTÖN ON MAHDOLLISTA HAKEA ARALTA KORJAUS-AVUSTUSTA TONTTILIITTYMÄN RAKENTAMISEEN SEKÄ PUMPPAAMOLLE (www.ara.fi, avustukset)

  8. ERITYISTÄ • UUDISRAKENNUSTEN KOHDALLA OSK LAINAA JOKO PIENPUHDISTAMON TAI UMPISÄILIÖN SIIRTYMÄAJAKSI. LIITTYMISMAKSU MAKSETAAN SILLOIN JOKO KOKONAAN TAI PUOLET ENNEN LAITTEEN ASENTAMISTA JA LOPUT ERILLISEN SOPIMUK- SEN MUKAAN. • TONTTIJOHDOT RAKENNETAAN KYTKENTÄÄ VAILLE VALMIIKSI

  9. SIIRTYMÄAIKA MAHDOLLISEN SIIRTYMÄAJAN JÄLKEEN VIEMÄRILIITTYMÄ TOTEUTETAAN KIINTEISTÖNOMISTAJAN KUSTANNUKSELLA RUNGON LIITOSKOHDASTA TALOLLE SEN HETKISEN KUSTANNUSTASON MUKAAN. SIIRTYMÄAJAN SIJASTA: - OSUUSKUNTA VOI TIETYISSÄ TAPAUKSISSA LUNASTAA NYKYISEN JÄRJESTELMÄN TAI - NYKYISEN JÄRJESTELMÄN VOI MYYDÄ KÄYTETTYNÄ JOS KUITENKIN HALUAA HAKEA SIIRTYMÄAIKAA, NIIN OSK VOI RAKENTAA TONTTIJOHDON ALUEEN LINJASTON RAKENTAMISEN YHTEYDESSÄ. OSUUSMAKSUSTA PERITÄÄN SILLOIN PUOLET RAKENTAMISVAIHEESSA. LOPUT MAKSETAAN ERILLISEN SOPIMUKSEN MUKAAN.