PXIE Module 2 Assembly Update. Matt Hoff LBNL April 3, 2014. Attaching a vertical vane to the U-brackets. Adrian. Kyle. U-bracket during fabrication. Two vanes in place. Modulation protection foam. All four vane brought together for the first time.
E N D
PXIE Module 2 Assembly Update Matt Hoff LBNL April 3, 2014
Attaching a vertical vane to the U-brackets. Adrian Kyle U-bracket during fabrication
Two vanes in place Modulation protection foam
Temporary joint plate Looking down stream. Note the adjustable tuners (all the way in) and a single Pi-mode rod.
Adjustable tuning end plate Outside, adjustable tuner mechanism Inside, note the adjustable tuner disc