Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008

Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008. Program Summary. The purpose of the RideSmart program is to reduce: The number of single occupant vehicles Vehicle miles traveled (VMT) Congestion mitigation

Download Presentation

Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008

  2. Program Summary • The purpose of the RideSmart program is to reduce: • The number of single occupant vehicles • Vehicle miles traveled (VMT) • Congestion mitigation • Emissions that are precursors to the formation of ozone • CMAQ funding allocated through GDOT

  3. Regional TDM Funding 2007

  4. RideSmart Services • Regional carpool and vanpool partner matching • Assisted nearly 31,000 commuters actively seeking carpool/vanpool partners in 2007 • Regional Guaranteed Ride Home (GRH) program • More than 2,700 alternative mode commuters were provided a GRH in 2007

  5. RideSmart Services • New! Bike Buddy Program • Matching bike-to-work partners • Pilot in Emory area • In coordination with CCTMA, Bike Emory and Atlanta Bicycle Campaign • New! SchoolPool Program • Matching parents of school-aged children • Public School pilot in Alpharetta

  6. RideSmart Services • MyRideSmart.com • The MyRideSmart.com website serviced approximately 35,067 unique visitors in 2007 • Park & Ride comprehensive map using Google Earth • Regional management with eleven employer service organizations (ESOs)

  7. Livable Centers Initiative

  8. Study Funding • $10 million over 10 years for studies • $500 million for transportation funding • 86 Studies • - 74 funded by ARC • - 12 grandfathered • 33 supplemental studies • $7.1 million in study funding • $1.5 million in supplemental funding • $132 million in transportation funding • $140+ million in total funding

  9. Completed LCI Studies Atlanta – 14 Cherokee – 4 Clayton – 5 Cobb – 11 DeKalb – 15 Douglas – 2 Fayette - 2 Fulton – 14 Gwinnett – 11 Henry – 2 Rockdale – 1 Outside – 5 Total – 86

  10. Development Numbers • LCI communities reported 722 developments: • 363 are complete • 176 are planned • 150 under construction The LCI developments result in: • Over 62,000 residential units • 9,492 hotel units • Over 12 million sq ft of commercial retail space • Over 40.2 million sq ft of office space LCI Implementation Report to be updated in 2008

  11. LCI Transportation Funding • FY03 first year transportation funds available • $132 million programmed between FY 2003-2011 for design, right-of-way and construction projects • Funds distributed to 83 projects in 50 LCI communities • 28 projects are under construction or have been constructed to date • 33 projects are advancing • 10 projects are “of concern”

  12. LCI Transportation Funding • Pedestrian Facilities – 58% • Multi-Use Trail – 6% • Bike/Ped Facility – 14% • Roadway Operations – 9% • Roadway Capacity – 3% • Transit Facilities – 9%

  13. INDEX Modeling • Computer modeling to measure impact of land use changes identified in LCI plans • Measures existing development vs. LCI plan build-out • INDEX software used with indicators focusing on 4 Ds: • Density = percent change in pop/emp per sq mile • Diversity = how diverse the study area is compared to the region • Design = how complete the sidewalks and density of the street network • Destinations = how accessible the study area is to the region

  14. Cumberland LCI Plan

  15. Cumberland Build-Out Modeling

  16. MacFarland LCI Plan

  17. MacFarland Build-Out Modeling

  18. lbs/capita/year

  19. lbs/capita/year

  20. lbs/capita/year

  21. Transit Planning Board (TPB)Regional Transit Vision “The TPB will develop a regional transit plan including a comprehensive financial plan”

  22. Regional Travel Demand • Travel demand: • Varies by corridor • Varies within corridors • Demand signals appropriate service levels and transit modes for corridors

  23. Concept 3 • Activity center focused • Expanded rail network to provide reliable travel times • Extensive BRT, express and intercity bus network • Cross region connectivity • Expanded local bus and activity center circulators • Truly multi-modal

  24. Cost of Transit(2030 Order of Magnitude Estimates)* • Cost to Build = $16 billion • $1.20 - $1.30 per household/day** • Costs to Operate & Maintain = $12 billion • $0.90 - $1.00 per household/day** • Cost to Operate & Maintain existing system=$26 billion • $1.95 - $2.10 per household/day** • Total to Build, Operate & Maintain = $54 billion • $4.05 - $4.40 per household/day** * Range is whether counting 10 county or 13 county region **Assumes 2010 ARC estimated household, decreases as number of households increases

  25. For more information or to make comments contact: Cheryl King Transit Planning Board Director 404-463-0311 CKing@TPB.ga.gov www.tpb.ga.gov

  26. Questions? • Contact Us • Tom Weyandt • www.atlantaregional.com