1 / 13

THEMIS SCIENCE WORKING TEAM MEETING Orbit Design Sabine Frey University of California - Berkeley

THEMIS SCIENCE WORKING TEAM MEETING Orbit Design Sabine Frey University of California - Berkeley. Overview. Overview Orbit Design Status Tail and Dayside Orbits Coast Phase Orbits Launch Day Analysis Back-up slides: Orbit evolution, conjunctions, shadows. Orbit Design Status.

jalene
Download Presentation

THEMIS SCIENCE WORKING TEAM MEETING Orbit Design Sabine Frey University of California - Berkeley

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMIS SCIENCE • WORKING TEAM MEETING • Orbit Design • Sabine Frey • University of California - Berkeley

  2. Overview • Overview • Orbit Design Status • Tail and Dayside Orbits • Coast Phase Orbits • Launch Day Analysis • Back-up slides: Orbit evolution, conjunctions, shadows

  3. Orbit Design Status Launch through 1st Tail Season Checkout Placement EFI 1st tweak 2nd tweak Perigee AXIAL P1-4 Raise 18-25d 19-37d 16-28d 48d 36d Old Concept: LD Oct 19-Nov 19, 2006 WD February 2007 Late Launch Concept: LDs since 11/27/2006 LD LD+n WD-24 WD WD+24 WD+60 LD LD+n 09-07-07 WD-88 WD-60 WD-24 WD WD+24 WD+60 Checkout Coast Phase Placement EFI 1st tweak 2nd tweak 3rd tweak Perigee PerigeeAXIAL P1 EFI P5 Raise EFI P2,3,4SIDE 26d 34d + 200d 65-70d 28d 36d 48d 36d LD shifts are compensated by coast phase ~230d P 2,3,4 mostly side thrust placement P 1, 5 axial thrust placement Additional maneuvers Tail 1: 27 New: Coast Phase Full Tail1 in 2008 Early EFI deploy on P2,3,4 Late EFI deploy on P1,P5 <Conjunctions> >> 200 h, 94h shadows < 180 min <dV> <670m/s

  4. Tail and Dayside Orbits Dusk Bow shock Dusk Flanks Flanks Tail season Magnetopause Dawn Flanks Dayside Center of Tail season Noon Coast phase: LD+60d -08/2007 Placement : 09/2007-11/2007 Tail 1 : WD early Feb 2008 12/2007-04/2008 Dayside 1 : WD early Aug 2008 06/2008-10/2008 Tail 2 : Wd early Feb 2009 12/2008-04/2009 Midnight Center of Dayside Flanks Dawn

  5. Coast Phase Orbits 1 Coast Phase : 1.15 Re x 15.4 Re, 15 deg inclination Approximate probe to probe separation with no particular phasing targets: 05/08 07/05 03/29 08/08 08/31 P1 P2 P5 P3 P4

  6. Coast Phase Orbits 2 Magnetic Foot Prints: End of March 2007 End of June 2007

  7. Launch Day Analysis Launch day period:Feb 15 to May 15, 2007 Accumulated dV Accumulated Conjunctions per season [m/s] per season [h]

  8. Back-up Slides

  9. Orbit Evolution 1st Year

  10. Orbit Evolution 2nd Year

  11. Conjunction Criteria • Inter probe separation • dYPn < ±2RE • Probe to neutral sheet • dZ3,4/NS < ± 2RE • dZ1,2/NS < ± 5 RE • GBO midnight/noon ± 6h Tail Season 2- Midnight Tail Season 1-Midnight P1 P2 P3 P5 P4 P1 P2 P3,P4 P5 Observation geometry Z-GSE] Z-GSM +5 Re +2 Re +5 Re +2 Re Magnetic Axis, 22 Diurnal Range -2 Re -5Re X-GSM -2 Re -5Re -30 -20 -10 Ecliptic X-GSE [Re] Distance to Neutral Sheet (NS) Distance to Neutral Sheet (NS) Equatorial plane Neutral Sheet (NS) P1 Orbit Plane Center Epoch of Tail Season

  12. Conjunction Analysis 2 Neutral Sheet Model Verification • Neutral Sheet (NS) model • Hammond, 1994 • Hinge point at inner probe • orbits • Distance to NS • |dz| < 2 Re for inner probes • |dz| < 5 Re for outer probes • Compared with Tsyganenko • Model T96 d March Hinge Point Zone December

  13. Tails Season Shadows Tail season 1 Tail Season 2

More Related