1 / 14

Preventivi 2008 Gruppo I

Preventivi 2008 Gruppo I. Marcello Maggi INFN Bari – Coordinatore -. Le attivit à. CMS e TOTEM. Collaudo e pilot run BaBar ultimo run e analisi dati KLOE coinvolgimento nell’upgrade SLHC Primi studi. Le persone. Chi va. Roberto Guida (CMS) Loredana Lopez (BaBar) Maria Mennea (CMS)

jaser
Download Presentation

Preventivi 2008 Gruppo I

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preventivi 2008Gruppo I Marcello Maggi INFN Bari – Coordinatore -

  2. Le attività • CMS e TOTEM. Collaudo e pilot run • BaBar ultimo run e analisi dati • KLOE coinvolgimento nell’upgrade • SLHC Primi studi

  3. Le persone

  4. Chi va • Roberto Guida (CMS) • Loredana Lopez (BaBar) • Maria Mennea (CMS) • Valeria Radicci (CMS) • Konstantin Abadjiev (CMS) Grazie!!

  5. Chi Viene • Lucia Barbone (CMS) • Francesco Cafagna (TOTEM) • Letizia Lusito (CMS) • Alexis Pompili (CMS) • Shinde (CMS) • Raj Thilak (CMS) • Vincenzo Spinoso (CMS)

  6. I Collaboratori • In attesa della riorganizzazione dei Servizi. • Il personale a cui Gruppo 1 fa riferimento • Francesco Chiumarulo • Adamantonio Clemente • Enza D’Alba • Riccardo Gervasoni • Giuseppe Liberti • Carlo Pinto • Michele Papagni

  7. I Servizi

  8. Richieste Finanziarie

  9. BaBar • Marco Pappagallo nuovo assegnista • Presenza a SLAC per un periodo di 3 mesi

  10. CMS • Le Sigle SI e RPC sono state accorpate • Il nuovo responsabile locale è Creanza (in bocca al lupo!) • 2 Lv1 e 2 Lv2 nel managment di CMS • MOF-B RPC Itala 200 k€ su CONS • SLHC Italia a Bari 275 k€ sj su CONS • Un gas cromatografo 25 k€ su INV • Tier2 172.1 k € (90 TB, 12 WN, 3 Server ed uno Switch)

  11. SLHC Da SMART/RD50 • Sensori MCz • MultiGeometry pixel 2 FTE Creanza, Fiore, De Palma, Manna, Tempesta

  12. KLOE • Parte il lavoro sull’upgrade. Costruzione di elettronica di FE per le GEM • Ranieri è il nuovo responsabile locale

  13. TOTEM • Cafagna contribuisce con 40% a questa attività (benvenuto in Gruppo 1) • 1 Lv1 nel managment dell’esperimento

  14. Conclusioni • Il Gruppo I entra in una nuova fase per gli esperimenti LHC. Il 2008 è un anno di transizione • Nuovi progetti all’orizzonte. KLOE2, SLHC e SuperB • Moduli da verificare ulteriormente

More Related