An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PEREKAYASAAN MAJLIS DAERAH PENGKALAN HULU: PERMIT PERNIAGAAN

  2. ProfilProjek

  3. PROSES ‘AS IS’Permit • KainRentangdanbanting (Kekal) • CajPembersihanPemunggahanBuah-Buahan (Kekal) • Permit SementaraHarian (BPR)

  4. 4.Buat bayaran & Pelekat dikeluarkan 1. Hantar permohonan Lengkap MM: 5 m 3. Kelulusan dan cetak bil MP: 10 mt 2. Semak permohonan MP: 5m MM: 5 m Tak Lengkap LULUS25 minit

  5. 4.Buat bayaran 1. Hantar permohonan Lengkap MM: 5 m 3. Kelulusan dan cetak bil MP: 10 mt 2. Semak permohonan MP: 5m MM: 5 m Tak Lengkap LULUS25 minit

  6. 8. Terima surat kelulusan Buat Bayaran 1. Hantar Surat permohonan MM: 3 hari 2. Terima & Rekod surat MP: 10 mt 4. Masukkan dalam fail MP: 10 mt 7. Hantar surat kelulusan MP: 15 mt MM: 20 m MM: 1 hari MM: 15 m 5. Buat surat kelulusan MP: 15 mt MM: 15 m LULUS 8 hari 4 Jam 3. Lulus permohonan MP: 5 mt 6. Tandatangan surat kelulusan MP: 5 mt

  7. Value Analysis of Process As-Is (Permit KainRentangdanBanting) Rule of Thumb: CVA and BVA – Simplify and Optimize NVA – Eliminate

  8. Value Analysis of Process As-Is (CajPembersihanPemunggahanBuah-buahan) Rule of Thumb: CVA and BVA – Simplify and Optimize NVA – Eliminate

  9. Value Analysis of Process As-Is (Permit SementaraHarian) CVA and BVA – Simplify and Optimize NVA – Eliminate Rule of Thumb:

  10. 8. Terima surat kelulusan Buat Bayaran 1. Hantar Surat permohonan Menyediakan borang permit sementara Menwujudkan fail bagi permohonan permit di Jabatan Pelesenan MM: 3 hari Hubungi melalui telefon 2. Terima & Rekod surat MP: 10 mt 4. Masukkan dalam fail MP: 10 mt 7. Hantar surat kelulusan MP: 15 mt Gabungkan no. 2 dan no. 4 MM: 20 m MM: 1 hari MM: 15 m 5. Buat surat kelulusan MP: 15 mt Penurunan kuasa kelulusan kepada PPKP MM: 15 m 3. Lulus permohonan MP: 5 mt 6. Tandatangan surat kelulusan MP: 5 mt

  11. PROSES ‘TO BE’Permit Sementara Harian

  12. 5. Terima makluman kelulusan Ambil permit dan buat bayaran 1. Hantar Borang permohonan 2. Terima , Rekod permohonan dam masukkan dalam fail MP: 10 mt 4. Buat surat kelulusan MP: 15 mt 5. Maklum kepada pemohon melalui telefon dan surat MP: 10 mt MM: 4 j 3. Lulus permohonan MP: 5 mt LULUS 4 jam 40 minit

  13. Value Analysis of Process As-Is (Permit SementaraHarian) CVA and BVA – Simplify and Optimize NVA – Eliminate Rule of Thumb:

  14. PerbandinganSebelumdanSelepasProjek LESEN PERMIT

  15. RingkasanPenemuandanCadanganPenambahbaikan

  16. RingkasanPenemuandanCadanganPenambahbaikan

  17. ISU Dan Cabaran