1 / 12

THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) ELECTROSTATIC ANALYSER (ESA) Charles Carlson

THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) ELECTROSTATIC ANALYSER (ESA) Charles Carlson University of California - Berkeley. Outline. Summary of ESA Status at FM1 PSR FM1 Configuration by SN End-Item Data Package, Summary and ToC

jera
Download Presentation

THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) ELECTROSTATIC ANALYSER (ESA) Charles Carlson

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMIS FM1 INSTRUMENT SUITE • PRE-SHIP REVIEW (PSR) • ELECTROSTATIC ANALYSER (ESA) • Charles Carlson • University of California - Berkeley

  2. Outline • Summary of ESA Status at FM1 PSR • FM1 Configuration by SN • End-Item Data Package, Summary and ToC • Final Test and Cal Results vs. Requirement Fulfillment • PFRs • FM1 Open Items

  3. ESA Status at FM1 PSR • Requirements and Design: • No major changes to Requirements or Design since M-CDR • No RFAs from previous reviews outstanding • Procurement: • All procurement is complete. • Assembly and Test: • 5 ESA mechanical assemblies complete • 6 sets of High Voltage power supplies complete and tested • 6 HV mother boards assembled and tested with HV supplies • 12 anodes (6 sets) assembled and tested with MCPs • 5 Preamp boards complete; 3 tested in complete units • 5 HV Interface boards complete; 3 tested in complete units • FM1-FM3 assembled and calibrated • 6 LVPS built and tested

  4. FM1 Configuration • HVI S/N 001, ACTEL Version 7 • HV Motherboard S/N 001A • HVN S/N 004 • HVP S/N 016 • Preamp S/N 007, ACTEL Version 7 • THAN Anode S/N 102, MCP set #30 • TLAN Anode S/N 106, MCP set #15 • LVPS S/N 037 • Analyzer Mechanical Assembly S/N 001

  5. FM1 EIDP: Electrical • THEMIS ESA FM1 (BINDER #25): • Includes THEMIS Coat and Stake Log, Mixing Records, Assembly Instructions, Schematics, Board Layouts, Repair/Rework Instructions, Inspection Reports, Bill of Materials and Magnetics Test Procedures (LVPS and HVPS only) for: • Mother Board • Sweep I/F Board • Pre-Amp Board • HVPS and HVNS Boards • LVPS Board (assembled and tested at SWRI) • Anodes THAN and TLAN

  6. FM1 EIDP: Mechanical • THEMIS ESA FM1 (BINDER #26): • List of Mechanical Assembly Procedures • Assembly Records • Assembly Report Sheet • Vibration Test Procedure and Report • Mechanical Drawing Tree • Master As-Built Mechanical Drawings

  7. ESA Requirements • ESA Mission Requirements Fulfillment: • FM1 MR fulfillment noted in THEMIS Verification Matrix (see MSE Presentation) • Integrated ESA and component parts compliant with mission requirements

  8. Results of ESA Calibration • Energy/Angle response confirmed • MCP Gain characteristics tested and successful • MCP Noise tested and acceptable • Anode response tested and confirmed • End-to-end performance has been verified • See Calibration Plots as examples of test results

  9. ESA PFR Status

  10. PFR Status • ESA PFR List: • All ESA PFRs have been Closed

  11. Open Items

  12. Open Items • ESA Final Calibration still to be done • ESA calibration confirmation after Environmental Testing

More Related