20 likes | 112 Views
HPT status hardware. large data set of test pulses taken last week (remote) 0.5% dead channels, 0.2% hot channels (without magnetic field) thus slow control + power + data taking tested adding more slow control information into data base ramping up HV next week
E N D
HPT status hardware • large data set of test pulses taken last week (remote) 0.5% dead channels, 0.2% hot channels (without magnetic field) thus slow control + power + data taking tested • adding more slow control information into data base • ramping up HV next week • switching on gas short before cosmic run • taking more cosmic data without magnetic field in May ready for next run period collaboration meeting, April '09, Aklara
HPT software & analysis status • alignment see talk of Irina about drift tube alignment • time alignment (trigger timing) ongoing • new version of charge determination sent to Antoine, internal note in preparation • momentum determination ready • beam contamination studies ongoing • same reco status as presented on last physics meeting by Björn collaboration meeting, April '09, Aklara