Status and schedule of ladder mounting. Y. Yamada at SVD meeting on Aug. 22, 2002. Ladder mounting is almost ready to start. Cleaning room Anti-electrostatic-discharge sheets on the floor and desks Ladder delivery status and schedule 1 st layer (6) : 7 delivered but one is not usable.

maddox
Download Presentation

Status and schedule of ladder mounting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status and schedule of ladder mounting Y. Yamada at SVD meeting on Aug. 22, 2002 • Ladder mounting is almost ready to start. • Cleaning room • Anti-electrostatic-discharge sheets on the floor and desks • Ladder delivery status and schedule • 1st layer (6) : 7 delivered but one is not usable. • 2nd layer (12) : 14 delivered but two are not usable. • Two draw relatively large current. • (One is not yet tested in KEK.) • 3rd layer (18) : 10 delivered. (5 are not yet tested in KEK.) • Remaining 8 can be produced in Aug.-Sep • if IDEAS and/or Melbourne can salvage 16 hybrids. • 4th layer (18) : 22 delivered.

  2. Partial ladder mounting http://yamadapc1.kek.jp/~yamaday/BELLE/SVD2/cad/SVD2.0/ladder/laddermount.html • We do not have required # of good ladders for 2nd and 3rd layer • We want to start the system test before final delivery in Dec. • Dismounting ladders after mounting final ladder • in 2nd and 3rd layer is dangerous. Layer-1 0 L1-#2 Low gain (normal noise) at BW-phi-0 1 L1-#3 No problem 2 L1-#4 Low gain (normal noise) at FW-Z-3 3 L1-#5 CMN=2000e at BW-phi 4 L1-#6 No problem 5 L1-#7 Large noise at FW-Z-2 Bad L1-#1 Abnormal pedestal

  3. Layer-2 6 open 7 open 8 L2-#3 No problem 9 L2-#4 No problem 10 L2-#6 No problem 11 L2-#1 I=1.2microA at FW, No gain (normal noise) at BW-Z-0 12 L2-#5 CMS=1800e at BW-Z 13 L2-#12 No gain in edge 10ch at FW-Z, No gain (normal noise) at FW-phi-3 14 L2-#8 No problem 15 L2-#9 No problem 16 L2-#13 Not tested in KEK 17 L2-#14 Not tested in KEK Bad L2-#10 CMS=65e, No gain at BW-phi L2-#11 CMS=100e, No gain at FW-phi Not mount? L2-#2 I=3.0microA, No gain at BW-phi-1 L2-#7 I=3.0microA, No gain at FW-phi-1

  4. Layer-3 18 open 19 open 20 open 21 L3-#1 No problem 22 L3-#2 No problem 23 L3-#3 No problem 24 L3-#5 No problem 25 L3-#6 Not tested in KEK 26 L3-#7 Not tested in KEK 27 L3-#4 I=2.0microA at FW 28 L3-#8 Not tested in KEK 29 L3-#9 Not tested in KEK 30 L3-#10 Not tested in KEK 31 wait 32 wait 33 wait 34 open 35 open

  5. Layer-4 • 36 open • 37 open • 38 open • 39 L4-#3 No problem • 40 L4-#7 No problem • 41 L4-#10 No problem • 42 L4-#18 No problem • 43 L4-#19 No problem • 44 L4-#4 No data for BW-Z • 45 L4-#6 No data for FW-phi • 46 L4-#9 No data for BW-Z • 47 L4-#26 Low gain (normal noise) at FW-phi • 48 L4-#21 No problem • 49 L4-#22 No problem • 50 L4-#25 No problem • 51 open • 52 open • open

  6. Layer-4 Not mount? L4-#1 Large and strange noise in BW-phi L4-#17 Large noise at FW-phi-2 and BW-phi-0,1,2,3, No gain at BW-phi-0, Mechanically repaired Wait L4-#5 Low gain and noise in FW-Z-3. No data for BW-phi L4-#11 Low gain and large noise in BW-phi-1 L4-#12 Large noise in FW-Z-1,2,3 L4-#14 Broken connector in FW-? L4-#16 Large noise in FW-phi and BW-phi L4-#20 Low gain at FW-Z-1,2,3 and BW-phi-1,2,3 L4-#23 Large noise at FW-phi, BW-Z and BW-phi L4-#24 Large noise at BW-Z-1 L4-#26 Low gain (normal noise) at FW-phi

  7. Schedule • We will start the ladder mounting on Aug. 26 since • Ishino-san is studying about the bad channel fraction of ladders • Better pins (smaller gap) will be available on Aug. 23. • 1st and 2nd layer ladders will be mounted by End of Aug. • Partial system test may be done with mounted ladders. • 3rd and 4th layer ladders will be mounted by Mid. Sep. • Final ladder mounting will be done in Dec. • and assembly with the Beam pipe in Jan.