An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status and schedule of ladder mounting Y. Yamada at SVD meeting on Sep. 12, 2002 • Second layer (11 out of 12) : 9 mounted. • 10th (L2#7,P6) was dismounted due to unstable leak current. • 11th is waiting for the study of leak current. • Third layer (14 out of 18) : • waiting for 4 more delivery around Sep. 20

  2. Large leak current on some ladders • e.g. L2#7 on P6 • ~3 mA before mounting • 2~9 mA after mounting • 2~4 mA after dismounting • plucking one of Bias-wires, • but no change in leak current

  3. Large leak current and CMN on some ladders • Layer 1 : less than 1 mA • Layer 2 : • less than 1 mA in L2#1, #4, #5, #6, #9, #10 • L2#3 on P9 : 2.0 mA • L2#12 on P13 : 1.4 mA • L2#8 on P16 : 3.2 mA • L2#2 on P17 : 3.86mA • L2#7 for P6 : 2.72~93.6mA • L2#13 for P7 : 5.01.0mA • L2#14 : 6.0 mA • Layer 3 : • less than 1 mA in L3#1, #2, #3, #5, #6 • L3#4 : 1.2 mA • L3#7 : 1.2 mA and CMN=6700e- • L3#8 : less than 1 mA but CMN=9500e-