1 / 1

Réunion mensuelle du Vendredi 29 mars 2013

Atelier ALU L’activité du secteur ALU sur avril se caractérise par une stabilité des volumes entre le CP3 et le CP4.

noel
Download Presentation

Réunion mensuelle du Vendredi 29 mars 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Atelier ALU L’activité du secteur ALU sur avril se caractérise par une stabilité des volumes entre le CP3 et le CP4. La nécessité de récupérer les journées de la semaine 19 non travaillée est confirmée pour les ateliers culasses coquilles qui ne sont pas en VSD. ( Fusion et Finition comprises ) Pas de changement notable sur l’engagement des PMP, le VSD du PMP1 se terminera en S24. La demande toujours élevée en EP, a nécessité des campagnes EB0 sur PMP2, afin de réguler la production des strates EB, l’atelier PSE sera en APLD les lundi et mardi de la semaine 15. Sur les ateliers de LAS, légère augmentation des volumes en SMNG et montée en cadence des cornes conforme à la prévision. Suppression de 2 semaines d’APLD pour l’atelier SMNG qui fonctionnera donc en S18 et en S24. Ci-dessous le détail du calendrier de travail de mars et prévisionnel avril et mai du secteur ALU : Réunion mensuelle du Vendredi 29 mars 2013

More Related