1 / 16

Improving Livelihoods by Improving Water Productivity, Access and Use Doug Merrey 2 September 2008

Limpopo River Basin Focal Project. Improving Livelihoods by Improving Water Productivity, Access and Use Doug Merrey 2 September 2008 FANRPAN Regional Dialogue, Lilongwe. Outline. Limpopo Basin Project Goals and Structure The Team Partners Approach

nuncio
Download Presentation

Improving Livelihoods by Improving Water Productivity, Access and Use Doug Merrey 2 September 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Limpopo River Basin Focal Project Improving Livelihoods by Improving Water Productivity, Access and Use Doug Merrey 2 September 2008 FANRPAN Regional Dialogue, Lilongwe

  2. Outline • Limpopo Basin • Project Goals and Structure • The Team Partners • Approach • Preliminary Findings—Opportunities for Interventions

  3. Limpopo Basin Overview • Area: 412,938 km2 Population: 14 million • Percentage urban: 43 Percentage rural: 57 • Percentage of population below poverty line: 56% • Mean annual rainfall: 200-1,200 mm (average 530 mm) • Climate: Ranges from tropical dry savanna and hot dry steppe to warm and cool temperate • Contribution of agriculture to GDP in the basin: 6.5% • Net irrigated area: 244,000 ha Land use: Crops, 234,000 ha; pasture, 1.78 million ha; forestry, 455,000 ha • Multiple water uses: mining, urban, industry, tourism • Institutional arrangement for managing water: Limpopo River Basin Commission [to be ratified] • Environmental conservation areas: 2 Ramsar sites, important game parks, coastal areas

  4. The Team-1 • FANRPAN and ARC-SA joint venture • IWMI and GWP-SA* regional partners • GWP and FANRPAN co-lead stakeholder consultations *Global Water Partnership-Southern Africa

  5. The Team-2 • National universities: Botswana, Eduardo Mondlane (UEM, Mozambique), Pretoria, Zimbabwe and Malawi • Mozambique Institute of Agricultural Research (IIAM) Team is large and diverse, but highly experienced and professional complemented by students

  6. Project Goals • To identify agricultural water interventions whose implementation will reduce poverty and enhance food, health, and environmental security in the Limpopo Basin and beyond • To identify gaps in knowledge about agricultural water management options in the basin requiring further research

  7. Work Packages (WP) & Lead Institutions • WP 1 Water and Poverty- U. Malawi • WP 2 Water Availability and Access- ARC • WP 3 Water Productivity- IWMI • WP 4 Institutional Analysis- FANRPAN Sec. • WP 5 Interventions Packages- FANRPAN Sec. • WP 6 Knowledge Management- ARC

  8. Research Approach • Make use of existing data bases • Build on outputs from CPWF and other on-going research projects • Use students strategically to fill gaps, provide analytical support

  9. Strategic interventions for the basin • Identify possible intervention packages • Test through consultations with key stakeholders(managed jointly by GWP and FANRPAN) • Assess through case studies Stakeholder Consultation seen as central to success

  10. A Methodological Innovation: The Intervention Matrix

  11. Example: Application of the Intervention Matrix But RWH works only under certain conditions

  12. The “Black Hole” of Limpopo Basin

  13. Limpopo “Black Hole” • From Kevin Scott, leader of water availability work package • Serious Implications: • Water going in does not come out—no outflow (Mozambique take notice!) • Limited options for productive use of water—need irrigation but not much water available • Rainwater harvesting probably not appropriate in the Black Hole! • Would a massive upstream dam enable regulated year-round flows downstream? • One option under investigation

  14. Huge Irrigation Potential in Mozambique • Massingir Dam—Lower Limpopo irrigation potential is +/- 90,000 ha • Chókwe Irrigation Scheme largest in Mozambique: rice, sugar cane, maize, vegetables, etc. • Complex history, victim of colonial exploitation and impacts of civil war • Presently low productivity, under-use, poverty Chókwe Main Canal

  15. Team Visit to Chókwe • Recent team visit and stakeholder consultation demonstrated that getting policies, input and output markets, support systems, and institutional framework right would make very high agricultural productivity and poverty reduction possible • Government now encouraging capital-intensive multi-national investments • What is potential for supporting a prosperous smallholder-based agriculture?

More Related