An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overviewof Beam Diagnostics Linac-4 Linac-4 Instrumentation review CERN, 18.10 2011 UliRaichBE/BI

  2. Linac-4 placement in the injector chain LT LTB Linac2 BHZ20 Linac4 PS Booster CERN Linac-4 instrumentation review Uli Raich BE/BI

  3. Linac-4 parameters CERN Linac-4 instrumentation review Uli Raich BE/BI

  4. Layout oftheLinac CERN Linac-4 instrumentation review Uli Raich BE/BI

  5. Parameters tobemeasured • Intensityat different energies(connectedto interlock system) • Beam trajectoryandenergy (phase) • Beam profile • Energyspread, will bemeasuredatlowenergyupto 3 MeVonly • Transverse emittanceat 45 keV, 3 Mev, 12 MeV, 160 MeV • Choppingefficiency • Bunchshape • Beam loss (connectedto interlock system)max beam loss: 1 W/mnot morethan 1 full beam pulse maybe lost • Diagnosticsforchargeexchangeinjectionintothe Booster CERN Linac-4 instrumentation review Uli Raich BE/BI

  6. Wide varietyofbeams The Booster produces a widevarietyofbeamswith different characteristics: Beam properties (intensityvariations) tobedefinedmainlybychopping CERN Linac-4 instrumentation review Uli Raich BE/BI

  7. Machinesectionsandtheirinstrumentation Installedatthe 3 MeVtest stand • Ion sourceand LEBT: • Currently: protonsource, ~ 40 mA, 450 μs • Faraday Cup, SEMGrid, transformerandtransverseemittancemeter (slit/grid) areinstalledandrunning. CERN Linac-4 instrumentation review Uli Raich BE/BI

  8. RFQ, Chopperandmeasurementline • RFQ andchopperline • RFQ isforeseentoarrive in October. • Measurement lineis in preparation: • 2 transformers • 3 BPMs measuringpositionandphase • Transverse emittancemeterwithnewslit • Bunchshapemonitorbeingassembledandtested in October • Halo monitortotestchopping • SpectrometerwithSEMGrid • Will bemoved after useandfinallyremovedfromthemachine • Chopper Line • 2 transformers • 2 wirescanners CERN Linac-4 instrumentation review Uli Raich BE/BI

  9. Measurement lineforcommissioningonly CERN Linac-4 instrumentation review Uli Raich BE/BI

  10. Chopper Line Avoidlosseswhenswitchingthedistributor Injectintowaiting RF bucketsofthe Booster CERN Linac-4 instrumentation review Uli Raich BE/BI

  11. DTL 3 BPMs 1 BCT 1SEMGrid Verylittlespace, neededdedicated design for all devices CERN Linac-4 instrumentation review Uli Raich BE/BI

  12. CCDTL BPMs after eachmodule BCT after the last module Profile measurements, alternatingSEMGridsandwirescanners after tanks 1,3,5,7 CERN Linac-4 instrumentation review Uli Raich BE/BI

  13. PIMS BPM after module 2,4,6,8,10,12 Profile measurement after module 3, 5, 9 (W,S,W) BCT after module 12 CERN Linac-4 instrumentation review Uli Raich BE/BI

  14. Dump Line andtransferline • Layout hasbeenfrozenonlyrecently • Emittancemeasurementusing 4 SEMGrids • Final positionof BSM • R&D foreseenforprofileandemittancemeasurementsusinglaserstripping. • BCTs, SEMGrids, BPMs (seetable) CERN Linac-4 instrumentation review Uli Raich BE/BI

  15. List of instruments CERN Linac-4 instrumentation review Uli Raich BE/BI

  16. List of Instruments CERN Linac-4 instrumentation review Uli Raich BE/BI

  17. Schedule • Designs ofalmost all instrumentsarefinished • First cablingcampaignfinished • Measurements on RFQ foreseenforbeginning 2012 • Constructionof all sensors + electronics in 2012 • Installation in thetunnelstartingfrom 2013 tobefinished in 2014 • Test beam ontodumpfrom 2014 onwards CERN Linac-4 instrumentation review Uli Raich BE/BI