150 likes | 157 Views
Harmonisation Working Group. HWG Meeting Wednesday, 22 nd February, 2012 NIAUR Offices Belfast. HWG Agenda. Approval of Minutes. Minutes from HWG meeting – 11 th January 2012. Feedback from HSG. Enduring Solution Project Update. Ann Ferguson / Joan-Edel Smith. ROI HSP Update.
E N D
Harmonisation Working Group HWG Meeting Wednesday, 22nd February, 2012 NIAUR Offices Belfast
Approval of Minutes Minutes from HWG meeting – 11th January 2012
Enduring Solution Project Update Ann Ferguson / Joan-Edel Smith
ROI HSP Update Conor Garrigan
Market Design Update Today’s Workload Overview
DR1085 V1 - Change to MPD29 - Grouped COS • Change Request • The unmetered market has grown significantly since Market Opening in 2005 • RMDS-driven process review project has assessed the processes in terms of bottlenecks, weaknesses and areas for improvement • This DR has been created to facilitate changes to MPD 29 • At today’s Meeting • Classification as ROI-specific
DR1115 V1 – Sundry Code Changes • Change Request • Use of Meter Configuration Code (Required) in NI Market • Work Type Code Value “W402” in NI Market • Addition of Supplier Codes (NI operations only at this time) • S40 (Budget Energy) • S41 (LCC Power Ltd) • Correction to Suppler Codes (for NI operations) • S08 (Vayu) • Code description changes • Meter Configuration Code “H050 - Interval Meter” • Reject Reason Code “CNM - Change of Tenancy/Legal Entity on 010(CoS)” • Withdrawal Reason Code “E1 – Miscellaneous”. • At today’s Meeting • Recommendation for approval as DR and MCR
DR1116 V1 -Updates to Enduring Solution NI Market Documentation • Change Request • Update of the Enduring Solution NI Market Documentation with corrections, clarifications and pending Discussion Request DR1115 at today’s meeting • At today’s Meeting • Classification as NI-Specific
MCR1079 V5 – HBL V2.3 • Change Request • HBL V2.3 Content Changes • No schema change required • HBL remains consistent with current Version of Harmonised schema • At today’s Meeting • Recommendation for approval
HWG Action Items Open Items as at end of last meeting
Next Steps • Next HWG meeting 4th April, 2012 (Dublin) • Dates for all meetings for 2012 are on the Calendar on the RMDS website
HWG Meeting • AOB
HWG Meeting Thank You