1 / 2

UWP SOLAR System v 8.9 Upgrade Schedule

UWP SOLAR System v 8.9 Upgrade Schedule. 2006/2007. Planning Phase Major Activities Define project objectives, scope, approach & schedule Establish project team, roles, responsibilities & budget Define project standards and administration processes

ruana
Download Presentation

UWP SOLAR System v 8.9 Upgrade Schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UWP SOLAR System v 8.9 Upgrade Schedule 2006/2007 • Planning Phase Major Activities • Define project objectives, scope, approach & schedule • Establish project team, roles, responsibilities & budget • Define project standards and administration processes • Develop project communications, testing, training & quality assurance plans • Monitor & track project schedule, issues, change, cost, progress, results & quality • Transition Phase Major Activities • Perform full system testing; 11/6/06 to 11/17/06 • Correct all system test issues and problems • Perform 2nd move to production test • Perform full integration testing;12/5/06 to 12/12/06 • Correct all integration test issues and problems • Perform 3rd move to production test • Perform parallel testing; 12/19/06 to 12/22/06 • Correct all parallel test issues and problems • Perform 4th move to production test (as needed) • Develop and conduct end user demos & training • Structure Phase Major Activities • Prepare & certify technical environment • Prepare & package UWP database for Oracle Upgrade Lab • Assess packaged delivered & UWP custom functionality to be implemented • Evaluate business & technical process changes • Finalize and conduct project team new functionality training/mentoring • Finalize end user training objectives, scope, approach and schedule • Deploy Phase Major Activities • Conduct end user demos & training • Freeze SOLAR System access 1/4/07 (4:30 pm) to 1/9/07 • Perform move to production 1/4/07 to 1/8/07 • Perform Go-Live testing 1/9/07 • Correct all issues and problems • SOLAR System access resumed 1/10/07 • Provide post Go-Live Support • Construct Phase Major Activities • UWP database upgraded at Oracle Upgrade Lab • UWP database upgraded on-site in UWP technical environment • Functional staff assess, refine & validate package functional setup & configuration • Technical staff assess, refine, recode & test package data access & application code • Security staff assess, refine & validate application security • Technical staff assess, refine, test & validate custom functionality & 3rd party interfaces • Finalize testing plans, approach and test cases for all levels of testing • Install and setup end user training tools & environment • Freeze upgraded database & refresh with current SOLAR System data

  2. System v 8.9 Upgrade Project Overview • Critical Dates & Events • System Testing - 11/6 through 11/17 • Integration Testing - 12/5 through 12/12 • Demo Day’s & Web Based Tutorial Information Sessions 12/4 through 12/13 • Faculty, Students & Staff take Web Based Tutorials 12/5 through 1/9 as available and personal schedules permit • Parallel Testing - 12/9 through 12/22 • SOLAR v 8.0 unavailable 4:30 PM 1/4/2007 through 1/9/2007 • Go-Live Testing 1/9/2007 • SOLAR v 8.9 access resumed 1/10/2007

More Related