1 / 24

Presidential Infrastructure Coordinating Commission: Gauteng Infrastructure Indaba - High-level Plans and Challenges Reg

This document discusses the high-level plans and challenges regarding infrastructure delivery in South Africa, as presented at the Gauteng Infrastructure Indaba on Friday, February 14, 2014. It outlines the objectives, priorities, and governance structure of the Presidential Infrastructure Coordinating Commission (PICC) and highlights the need for improved infrastructure links in rural areas and the poorest provinces.

rudolphw
Download Presentation

Presidential Infrastructure Coordinating Commission: Gauteng Infrastructure Indaba - High-level Plans and Challenges Reg

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION Gauteng Infrastructure Indaba High level plans and challenges regarding infrastructure delivery in South Africa Friday, 14 February 2014

  2. Background 1

  3. Moving from poor performance to integrated, multi-programme delivery • Improved programme co-ordination in state supported by project management and engineering skills • Align the National, Provincial and Local structures • Long term support for long term projects, especially regional projects • Predictable process for implementing projects including streamlined regulatory approvals • Strong policy direction for incentivisation of supplier development, localisation and private sector participation • Plan and build projects that promotes low life cycle costs • Standardised designs and delivery • Full life cycle costs recovered through user tariff and a committed funding strategy • Strengthening project controls and monitoring in government departments and state owned enterprises • Standardised and simple automated reporting to track project progress and performance • Early warning to address bottlenecks • Poor planning at institutional level • Slow approval of projects • Late start to projects • Poor quality of execution • High costs and monopoly pricing • Poor industry reaction time • Poor project controls (schedule, cost, quality, safety, health and environment) • Tender abuses and corruption • Unrealistic acceleration • Unplanned and costly rework of designs or construction • No political alignment with no champion • Permitting (e.g. EIA) rework or delays • Lead time delays • Slow or non-payment of contractors Improve by

  4. PICC Terms of reference  Identify 5 year priorities • Promote balanced economic development • Unlock economic opportunities • Promote mineral extraction and beneficiation • Address socio-economic needs • Promote job creation • Help integrate human settlements and economic development  Develop 20 year project pipeline Development Objectives: skills, localisation, empowerment, research & development  Expand maintenance: new and existing infrastructure  Improve infrastructure links: rural areas and poorest provinces  Address capacity constraints and improve coordination and integration  Scale up investment in infrastructure   Address impact of prices Support African development and integration 

  5. Governance Structure • PICC Council comprises Cabinet Ministers, Premiers and Executive Mayors and consider the performance dashboards for every SIP, Report into Cabinet, Recommend policy changes to Cabinet • PICC Manco comprises a number of Ministers to unblock challenges; monitor the development plan; ensure coordinated regulatory approvals and enablers • PICC Secretariat is supported by Ministers, Deputy Ministers and oversee day-to-day work of technical team • PICC Technical Task Team comprises skills and competence drawn from public agencies and government • Intergovernmental Forum Chair and SIP Coordinators - support the PICC through implementing SIPs • Implementation Agencies are responsible for project implementation within budget, on time & within the required levels of quality

  6. Analysis of population distribution & density, combined with limited access to basic services and transport resulting in the movement of people to economic hubs in the country Population (2010) Access to utilities Population (2010) Combined Area with limited access to services Economic centers High population density Constrained transport & services 7

  7. Fragmentation compromises urban efficiency necessary for effective utility provision and sustained economic growth Economic centers High population Density Constrained transport & services 9

  8. Addressing spatial imbalances through targeted infrastructure investment Heavy Haul Heavy Haul Needs analysis Electricity indicates the bulk infrastructure requirements – electricity, water, transport, town planning, ports, etc. Pipeline Industrial Haul Pipeline Electricity Heavy Haul …….. Heavy Haul Pipeline Electricity Population Mining Limited Utility Services Generation (wind, solar) Water

  9. SIP 1: Unlocking the Northern Mineral Belt with Waterberg as the Catalyst Investment in rail, water pipelines, energy generation and transmission infrastructure will catalyse unlocking of rich mineral resources in Limpopo resulting in up to 98 000 direct jobs across the areas covered. Urban development in the Waterberg will be the first major post apartheid new urban centre and will be a “green” development project. Mining includes coal , platinum and other minerals for local use and export, hence the rail capacity is being extended to Mpumalanga power stations and for export principally via Richards Bay and in future Maputo (via Swaziland link). The additional rail capacity will shift coal from road to rail in Mpumalanga with positive environmental and social benefits. Supportive logistics corridors will help to strengthen Mpumalanga’s economic development. Primary Mineral Reserves Platinum - 6 323 tons 8

  10. SIP 1: Unlocking the Northern Mineral Belt with Waterberg as the Catalyst • Rail and road: • Waterberg - 600km rail (increase capacity to 112Mtpa) • Mpumalanga - 140km rail (increase capacity to 32Mtpa) • Swazi link – 163km (increase capacity from 16Mtpa to 33Mtpa) • Export link – upgrade Ermelo to Richards Bay • Rolling stock :14000 wagons, 1000 locomotives • Road: national, provincial and municipal roads • Moloto corridor centered around deeper economic linkages with Gauteng • Water: • Mokolo Phase 2 - 170km water pipeline providing potentially 150Mm3 per annum • Olifants River Water Resource Development - De Hoop Dam (80Mm3 per annum) and distribution system (260km pipeline) • Electricity: • Medupi Coal Fire Power Station • New Coal fired power station (Coal 3) 4800MW, and transmission lines • Urban development, including human settlement, energy, roads, etc.: • Housing, community centers, public transport, green urban development and roads • Port: • Richards Bay capacity from 14.2Mtpa to 23.7Mtpa • Industrial Development: • 80 000 barrels/day Coal-to-liquid plant (Mafutha) • Coal Mines : 3 mines 5-10 Mtpa per mine 9

  11. Geographic SIPs SIP 2: Durban-Free State-Gauteng Logistics and Industrial Corridor New dam at Mzimvubu with irrigation systems N2-Wildcoast Highway which improves access into KZN and national supply chains Strengthen economic development in Port Elizabeth through a manganese rail capacity from Northern Cape A manganese sinter (Northern Cape) and smelter (Eastern Cape) Possible Mthombo refinery (Coega) and transshipment hub at Ngqura and port and rail upgrades to improve industrial capacity and performance of the automotive sector. • Strengthen the logistics and transport corridor between SA’s main industrial hubs • Improve access to Durban’s export and import facilities • Integrate Free State Industrial Strategy activities into the corridor • New port in Durban • Aerotropolis around OR Tambo International Airport SIP 3: South-Eastern node and corridor development

  12. Geographic SIPs SIP 5: Saldanha-Northern-Cape development corridor SIP 4: Unlocking the economic opportunities in the North-West Province • Integrated rail and port expansion • Back-of-port industrial capacity (including and IDZ) • Strengthening maritime support capacity for oil and gas along African West Coast • Expansion of iron ore mining production and beneficiation • The acceleration of investments in roads, rail, bulk water, water treatment and transmission infrastructure • Enabling reliable supply and basic service delivery • Facilitate development on mining, agricultural activities and tourism opportunities • Open up beneficiation opportunities in the NW Province

  13. Energy SIPs SIP 8: Green Energy in support of the South African economy Accelerate the construction of new electricity generation capacity in accordance with the IRP2010 to meet the needs of the economy and address historical imbalances. Monitor implementation of major projects such as new power stations: Medupi, Kusile and Ingula. Support sustainable green energy initiatives on a national scale through a diverse range of clean energy options as envisaged in the Integrated Resource Plan (IPR2010) and to support bio-fuel production facilities. SIP 9: Electricity Generation to support socio-economic development SIP 10: Electricity Transmission and Distribution for all Expand the transmission and distribution network to address historical imbalances, provide access to electricity for all and support economic development. Align the 10-year transmission plan, the services backlog, the national broadband roll-out and the freight rail line development to leverage off regulatory approvals, supply chain and project development capacity.

  14. Spatial SIPs SIP 6: Integrated Municipal Infrastructure Project Develop national capacity to assist the 23 least resourced Districts (18.9 million people) to address all the maintenance backlogs and upgrades required in water, electricity and sanitation bulk infrastructure. The road maintenance programme will enhance the service delivery capacity thereby impacting positively on the population. SIP 7: Integrated Urban Space and Public Transport Programme Coordinate planning and implementation of public transport, human settlement, economic and social infrastructure and location decisions into sustainable urban settlements connected by densified transport corridors. This will focus on the 12 largest urban centres of the country, including all the metros in South Africa. Significant work is underway on urban transport integration. SIP 11: Agri-Logistics and Rural Infrastructure Improve investment in agricultural and rural infrastructure that supports expansion of production and employment, small-scale farming and rural development, including facilities for storage (silos, fresh-produce facilities, packing houses); transport links to main networks (rural roads, branch train-line, ports), fencing of farms, irrigation schemes to poor areas, improved R&D on rural issues (including expansion of agricultural colleges), processing facilities (abattoirs, dairy infrastructure), aquaculture incubation schemes and rural tourism infrastructure.

  15. Social Infrastructure SIPs SIP 12: Revitalisation of Public Hospitals and other Health Facilities Build and refurbish hospitals, other public health facilities and revamp 122 nursing colleges. Extensive capital expenditure to prepare the public health care system to meet the further requirements of the National Health Insurance (NHI) system. The SIP contains major builds for 6 hospitals. SIP 13: National School Build Programme A national school build programme driven by uniformity in planning, procurement, contract management & provision of basic services. Replace inappropriate school structures and address basic service backlog & provision of basic services under the Accelerated School Infrastructure Delivery Initiative (ASIDI). In addition address national backlogs in classrooms, libraries, computer labs and admin buildings. Improving the learning environment will go a long way in improving outcomes especially in the rural schools as well as reduce overcrowding. SIP 14: Higher Education Infrastructure Infrastructure development for higher education focusing on lecture rooms, student accommodation, libraries and laboratories as well as ICT connectivity. Development of university towns with combination of facilities from residence, retail and recreation & transport. Potential to ensure shared infrastructure such as libraries by universities, FETs & other educational institutions. Two new universities will be built – in Northern Cape and Mpumalanga.

  16. Knowledge SIPs SIP 15: Expanding access to Communication Technology Infraco capacity on WACs. Local Municipal Network Provide for broadband coverage to all households by 2020 by establishing core Points of Presence (POP’s) in district municipalities, extend new Infraco fibre networks across provinces linking districts, establish POP’s and fibre connectivity at local level, and further penetrate the network into deep rural areas. While the private sector will invest in ICT infrastructure for urban and corporate networks, government will co-invest for township and rural access as well as for e-government, school and health connectivity. The school rollout focus initially on the 125 Dinaledii (science and math focussed) schools and 1525 district schools. Part of digital access to all South Africans includes TV migration nationally from analogue to digital broadcasting. SKA is a global mega science project, building an advanced radio-telescope facility linked to research infrastructure and high speed ICT capacity & provides an opportunity for Africa and South Africa to contribute towards global advance science projects. Districts connected into provincial backbone Infraco national network SIP 16: SKA & Meerkat

  17. Regional SIPs • Population: 1 bn • Arable land • Water resources • Oil, gas and mineral resources • Growing economies Participate in mutually beneficial infrastructure projects to unlock long-term socio-economic benefits by partnering with fast growing African economies with projected growth ranging between 3% and 10%. The projects involving transport, water and energy also provide competitively-priced, diversified, short and medium to long-term options for the South African economy where for example, electricity transmission in Mozambique (Cesul) could assist in providing cheap, clean power in the short term whilst Grand Inga in the DRC is long term. All these projects complement the Free Trade Area (FTA) to create a market of 600 million people in South, Central and East Africa. SIP 17: Regional Integration for African cooperation and development

  18. Water and Sanitation SIP SIP 18: Developing a sustainable water supply-chain: “Source-to-tap-to-source National project covering all nine provinces A 10-year plan to address the estimated backlog of adequate water to 1.4 million households and 2.1 million households to basic sanitation. The project will involve the provision of sustainable supply of water to meet social needs and support economic growth. Projects will provide for new infrastructure, rehabilitation and upgrading of existing infrastructure, as well as improve management of water infrastructure.

  19. Skills • Database from a select number of entities • 7,173 artisans (3,468 Eskom, 1,900 Denel, 117 DWA, 200 Nelson Mandela, 551 City of Jo’burg, 472 City of Cape Town, 337 from Water Boards) • 6,132 technicians (4,074 Eskom, 1,731 SAA, 235 DWA, 36 Tshwane, 56 Ekurhuleni) • 1,359, project planners & managers (1,109, Eskom, 12 Nelson Mandela, 83 DBSA, 77, City of Jo’burg, 64, City of Cape Town, 14, Water Boards.) • 713 Financial managers (642 City of Jo’burg, 54 City of Cape Town,16 Water Boards) • 182 Procurement Specialists (15 DBSA, 119 City of Jo’burg, 45 Water Boards) • 131 technologists (16 DWA, 89 Tshwane, 8 Ekurhuleni, 18 Water boards) Other professionals Projection of skills required for a 800MW coal-fired power station Supervision Painters Millwrights Electricians Sheetmetal Workers Truck drivers Pipe fitters Insulators Boiler Makers Cement Finishers Structural Steel Workers Unskilled Labourers Equipment Operators Carpenters 18 18

  20. Land - the challenge experienced in gaining access to land EIA, appeals and expropriation can take up to 6,5 years

  21. Industrial Development Mining With access to water, electricity and transport logistics the SIPs will unlock mining development in Limpopo and the North West Province. Inputs: Bitumen Local capacity to be increased with investment in port handling facilities required to import bitumen to meet unplanned shortages Platinum -6323 tons Inputs: Steel Most of the SOCs require steel fabrication as an input into their long term capital expansion programmes which is being leveraged to assess the possibility of local steel milling and fabrication

  22. Delivery Compact and Development Impact Plans Compacts aligned to delivery PICC 1 Infrastructure Plan Presidency Directives Delivery Agreement / Outcomes Compact SIP Coordinator 18 SIPs MOUs Implementing Agent & Compacts < 200 projects / components Shareholder Shareholder Compacts

  23. What Next • NDP alignment • Infrastructure Development Bill • Skills Development • Maintenance • IBT’s ( Innovative Building Technologies) • Localisation • State capacity • Funding • Authorisations • Youth Employment • Regulatory environment • Collaboration across 3 spheres • Forward Planning

  24. Empowering a Nation, triggering development • The Infrastructure Plan is a bold effort to transform the economy, laying the basis for growth and jobs • The Plan is an opportunity to mobilise the nation behind a common vision and requires partnerships with business and labour • Aimed at promoting: • Re-industrialisation through manufacturing of inputs, components and machinery • Skills development aimed at critical categories • Greening the economy • Empowerment 23