TH 610 Design-Build Project S.P. 2771-38. PROJECT INFORMATIONAL MEETING. Dan W. Penn, P.E. Mn/DOT Project Manager. Looking West @ TH 169 Looking East @ Elm Creek Blvd. February 25, 2009. INTRODUCTION Tom OKeefe, Mn/DOT Metro District

stuart
Download Presentation

TH 610 Design-Build Project S.P. 2771-38

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TH 610Design-Build ProjectS.P. 2771-38 PROJECT INFORMATIONAL MEETING Dan W. Penn, P.E. Mn/DOT Project Manager Looking West @ TH 169 Looking East @ Elm Creek Blvd. February 25, 2009

  2. INTRODUCTION Tom OKeefe, Mn/DOT Metro District ADE – Program Delivery • Project Background • Economic Stimulus Program

  3. Design-Build Best-Value • Request for Qualifications (RFQ) • Short-listing • Stipends • Request for Proposals (RFP) • Technical Proposal • Alternate Technical Concepts • Price/DBE Proposal

  4. Conflict of Interest • Approach Posted on Website • Clarification #1 (GEC) • Clarification #2 (Other Contracts) • Disclosure • Provide Information

  5. Design-Build Changes • Shorter Proposals (risks) • Scoring Approach • Responsiveness • 50 Points • Information made public at Award • Written Communication • Quality Approach

  6. INTRODUCTION Dan Penn, Mn/DOT Metro District Project Manager

  7. DISCLAIMER What is discussed today is informational only, meant to assist interested teams in the pursuit of this project. The ultimate contract requirements will be included in the Request for Proposals (RFP). There may be changes between now and the time the RFP is issued.

  8. Project Partners • City of Maple Grove • City of Brooklyn park • Hennepin County • Federal Highway Administration • Design-Build Proposers • HNTB – Design-Build Contract Development

  9. Project Information http://www.dot.state.mn.us/designbuild/stimulus.html

  10. Project Description • General Layout • Roadway • Bridges • Drainage • Right of Way Looking East from Zachary Lane Looking West from Jefferson Highway

  11. Project Description • Utilities • Noise • Visual Quality • Borings GRE High Voltage Power Lines @ Elm Creek Blvd. GRE High Voltage Power Lines @ Hemlock Ln. Run Along North Side Of Proposed TH610 Corridor

  12. Project Goals • Quality • Minimizes future maintenance. • Safe working environment for workers and public. • Budget • Stakeholder Satisfaction • Coordinate and mitigate community and stakeholder issues; construction noise, haul roads, public relations, etc. • Environmental Compliance • Schedule • All work completed by November 2011.

  13. Design-Build General Discussion Points • Co-Housing – yes. • Mn/DOT purposing to utilize vacant space at the Golden Valley construction office. • Key personnel only • DBE • Goal will be determined at RFP • Outreach Meeting

  14. ScheduleTentative – Subject to Change ACTIVITY Due Date Issue RFQ February 13 Deadline for RFQ Questions March 12 SOQ Due Date March 19 Determine Short List March 27 Issue RFP May 1 Technical Proposals Due July 13 Price Proposals Due July 30 Final Scoring of Proposals July 30 Price Proposals Opened July 31 First Notice to Proceed August 28

  15. Request for Qualifications • Deadline for RFQ questions – March 12 • SOQ due date – March 19 • Central Office (11:00 am) • Deliver to Jay Hietpas • Mn/DOT Single Point of Contact • dan.penn@dot.state.mn.us