1 / 4

rderynck: from SP99 Part 1 Draft 2 Edit 3

rderynck: from SP99 Part 1 Draft 2 Edit 3. rderynck: from SP99 Part 1 Draft 2 Edit 4. Enterprise. Enterprise. Level 5. Level 5. Site Business Planning &. Site Business Planning &. Level 4. Level 4. Logistics. Logistics. Enterprise. Enterprise. Manufacturing. Site Manufacturing.

Download Presentation

rderynck: from SP99 Part 1 Draft 2 Edit 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. rderynck: from SP99 Part 1 Draft 2 Edit 3

  2. rderynck: from SP99 Part 1 Draft 2 Edit 4 Enterprise Enterprise Level 5 Level 5 Site Business Planning & Site Business Planning & Level 4 Level 4 Logistics Logistics Enterprise Enterprise Manufacturing Site Manufacturing Site Manufacturing Level 3 Level 3 Operations and Control Operations and Control Area Supervisory Control Area Supervisory Control Level 2 Level 2 Basic Process Basic Process Basic Process Control Control Control Level 1 Level 1 Safety Safety Safety - - - Critical Critical Critical Control Control Control Process Process Level 0 Level 0

  3. Corporate Systems Enterprise Site Business Planning & Engineering Systems Enterprise Logistics Operations Control Centers Wide Area Network Supervisory Control System Management Site Monitoring & Local Display Remote Site Basic Process Local Control Control Protection Equipment Remote Sites rderynck: proposed SP99 SCADA reference Jan 06 SCADA world does not normally think in terms of CIM levels but a possible mapping of the concept is shown here Level 5 Level 4 Level 3 Level 2 Level 1 Level 0

  4. Electric Power System Functional Areas Other Control Centers Control Center Operations Control Center Supervision Large Power Plants Scheduling and other Market Applications Power Plant SCADA Corporate Systems Work Management Power Plant Controllers Corporate Management and Finances Outage Management Intelligent Sensors Customer Services and Billing Energy Management System Generation Equipment SCADA System Trouble Call Handling Prime Mover Equipment Substations Systems Engineering Systems Distributed Generation Substation RTU or Master Customer Building Energy Management Engineering Planning Substation HMI Construction DER Controllers Intelligent Electronic Devices GIS AM/FM System Operations Corporate Intelligent Sensors Substation Equipment Substation Engineering Generation Equipment Intelligent Sensors Protection Engineering Customer Metering Distribution Feeders Customer Meters and Smart Gateways Equipment on feeders See Notes page for source

More Related