1 / 11

Status of LCcal Project

Status of LCcal Project. Scintillator tiles Fibr e s Si detector Simulation Future beam tests. Remind: . Contributors (Como, LNF, Padova, Trieste):

terrel
Download Presentation

Status of LCcal Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of LCcal Project • Scintillator tiles • Fibres • Si detector • Simulation • Future beam tests Remind: Contributors (Como, LNF, Padova, Trieste): M. Alemi, A.Anashkin, M.Bettini, S.Bertolucci, E. Borsato, M. Caccia, P.C, C. Fanin, S. Miscetti, M. Prest, R. Peghin, L. Ramina, E. Vallazza P. Checchia ECFA-DESY St. Malo

  2. Scintillator tiles • 3 mm Kuraray SCSN-61 (25x25 cm2) • 3 mm Bicron BC-408 (25x25 cm2) Machined with vacuum plate as holder Whole Production starting now P. Checchia ECFA-DESY St. Malo

  3. Fibres Room temperature curvature problem solved Use middle temperature (500-700) oven Kuraray 1mm d. Y11 300 ppm multicladding > 3 ph e- /m.i.p./tile obtained stable in >30 days time P. Checchia ECFA-DESY St. Malo

  4. Si Detector • Problems with the detector production: • 1)delay due to foundry, 2)bad quality in the first lot of wafers 3)second lot (4 wafers) under test: P. Checchia ECFA-DESY St. Malo

  5. 1 wafer broken ‘soft breakdown’ Full depletion <30 V C vs Vbias 30 pF P. Checchia ECFA-DESY St. Malo

  6. PCB : Printed board design ready in production Chip side Detector side P. Checchia ECFA-DESY St. Malo

  7. Simulation (Geant 4) Expected Energy resolution Light collection effect (20 %) Lateral dimension with tungsten P. Checchia ECFA-DESY St. Malo

  8. Future Beam Tests P. Checchia ECFA-DESY St. Malo

  9. Tunable number of 500 MeV electrons 2 electrons 5 electrons P. Checchia ECFA-DESY St. Malo

  10. Beam time at CERN: Do you want to share it ? P. Checchia ECFA-DESY St. Malo

  11. Conclusions • Scintillator plates production starting • Si detectors to be tested (and final production to be scheduled) • Beam test with partial detector at CERN • Full detector test ( Frascati? ) by september P. Checchia ECFA-DESY St. Malo

More Related