Summary • For InGaAs samples: -- The time dependent annealing tests have been finished at all three temperatures (250’C, 275’C and 300’C). The diffusion length measurements are still in process -- Two batch of Ni-InGaAs devices have been finished to test the contact resistance. • For neural probe samples: -- The Si on a new batch of 6 samples have been thinned down with Atsunori and YunGoo’s help, thanks a lot for help. -- I received the samples on Monday, and the dots layer writing and metal deposition have been finished.
250’C Test Fin [110] 10 min 20 min 40 min 60 min 90 min 120 min
250’C Test Fin [100] 10 min 20 min 40 min 60 min 90 min 120 min
275’C Test Fin [110] 3 min 6min 12min 20 min 30 min 40 min
275’C Test Fin [100] 3 min 6min 12min 20 min 30 min 40 min
300’C Test Fin [110] 2 min 4 min 6 min 8 min 10 min 15 min
300’C Test Fin [100] 2 min 4 min 6 min 8 min 10 min 15 min
Ni-InGaAs Contact Resistance Test 1st batch of samples: Before electrode writing After electrode writing
2st batch of samples: Non-annealed Annealed ~ 106 Ohm ~ 108 Ohm
Plan • Continue on the Ni-InGaAs diffusion length measurement. • Start testing the TEM sample process -- Transfer of InGaAs Fins on copper TEM grids • Prepare new set of neural probe samples according to the feedback of pillar etching