320 likes | 446 Views
Run12 MuTR HV Optimization. RIKEN/RBRC Itaru Nakagawa. ADC Distribution. Landau Distribution. Most Probable Value (MPV) Of Minimum Ionization Particle (MIP). Resolution vs. S/N Relation. Resolution. N/S. Goal : Getting Position Resolution of 100 ~ 150 m m! Reduce Noise (Pedestal RMS)
E N D
Run12 MuTR HV Optimization RIKEN/RBRC Itaru Nakagawa
ADC Distribution Landau Distribution Most Probable Value (MPV) Of Minimum Ionization Particle (MIP)
Resolution vs. S/N Relation Resolution N/S Goal : Getting Position Resolution of 100 ~ 150 mm! Reduce Noise (Pedestal RMS) Increase Signal -> Increase Gain (HV, Gas)
Run12 MuTR HV Scan Executed Feb. 14, 2012. 200GeV pp Ar : CO2 : CF4 = 52 : 29.4 : 18.6 (analysis result from Atlantic Analysis Lab. March,7,2012) ADTX : LV on (-20 ADC channel in MIP)
HV Scan Conditions • Run9 vs. Run12 • North should be +20% increase in ADC channel • South should be similar gain.
North Gain Comparison DADC=p0+p1*DV+p2**DV No advantage seen for +2% increase of Ar gas MPV [ADC channel]
South Gain Comparison -20ch for Run12 Due to ADTX on Overall, MuTR Gain seems lower than that of Run11
North 200GeV pp Gap-by-Gap MPV HV setting : -25V of Run11 500GeV ppHV setting Gap-2 Station-1 Gap-3 Gap-1 Oct-1 Oct-2 Oct-3 Oct-4 Station-2 Station-3
North St-1 Pedestal Distribution (Oct.17,2011) Plane-3 Plane-1 Plane-2 Plane-6 Plane-4 Plane-5 Oct.1 Oct.2 Oct.3 Oct.4 Ground cables Oct.5 Oct.6 Oct.7 Oct.8 Noise Level is Significantly Improved, by fixing anode ground cables.
Plane Averaged North Pedestals for Run12 Station-1 Pedestal Level = 1.5 ~ 2.5 Station-2 Pedestal RMS [ADC channel] Station-3
Additional HV to achieve N/S=1.3% Additional DV to Achieve N/S => 1.3%
South Station-3 Landau Fit Low Gain
South 200GeV pp Gap-by-Gap MPV HV setting : -25V of Run11 500GeV ppHV setting Gap-2 Station-1 Gap-3 Gap-1 Oct-1 Oct-2 Oct-3 Oct-4 Station-2 Station-3 Low gain
South Run11 MPV vs. Run12 200GeV-pp Low gain from past
South Pedestal RMS Run12 Station-1 Average ~ 2 ADC channels Pedestal RMS [ADC Channel] Station-2 Station-3
South Noise/Signal Ratio @ Run12 200GeV pp Pedestal RMS / MPV [%]
South Additional +DV for N/S=1.3% Additional DV to Achieve N/S => 1.3%
Run11 Gas Ratio Change Minor only a few % Gain change. Unit:%
North Gain before/after Ar Increase Green:after, 4/9, 1020mbar Red:before, 3/17, 1017mbar
Gain Change (Station Averaged) About 20% gain increase was observed.