MuTr HV Optimization

MuTr HV Optimization. RIKEN/RBRC Itaru Nakagawa. Goal. Find out HV to achieve Noise RMS/MIP peak (N/S) = 1%. Gain can be similar to chambers, but noise distributions are unique from chamber to chamber.

paul-moon
Download Presentation

MuTr HV Optimization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa

  2. Goal • Find out HV to achieve Noise RMS/MIP peak (N/S) = 1%. • Gain can be similar to chambers, but noise distributions are unique from chamber to chamber. • Historically MuTR has been operated with only three HV settings (St1=1875V, St2=1900V, St3=1925V) • Vary HV channel by channel basis to set N/S ~ 1%.

  3. Cosmic Data Taking • Dedicated Measurements : Dec.23 ~ Jan. 11 • MuIDLL1 N1D||S1D trigger : 60Hz ~ 120Hz • Work area: phnxmutr@va020:/data2/SubSystems/phnxmutr/itaru/MipAna • README for instruction Event Selection: Peak Strip ADC of Cluster. No track required.

  4. North Arm

  5. Station-1 Gap-1 Gap-3 Gap-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8

  6. Station-2 Gap-1 Gap-3 Gap-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8

  7. Station-3 Gap-1 Gap-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8

  8. MIP Peak Positions @ Nominal HV oct1 oct2 oct4 oct6 St-1 oct3 oct5 oct7 oct8 gap1 gap2 gap3 St-2 St-3

  9. Pedestal RMS (North Station-1)

  10. Plane Averaged Pedestal RMS [ch] oct1 St-1 oct2 oct4 oct6 oct3 oct5 oct7 oct8 St-2 St-3

  11. Noise RMS/MIP Peak @ Nominal HV St-1 St-2 St-3

  12. N/S .vs Operation Voltage +30V +50V Linear Fit +15V nominal St-1 N/S : 2% -> 1% Needs additional 110V -30V Nominal + Additional Voltage [V] St-2 St-3 Noise RMS / MIP Peak ADC [%]

  13. N/S~1% Required Voltage : Nominal + ?V +50V limit St-1 St-2, St-3 planes are averaged over common HV chain St-2 St-3

  14. South Arm

  15. Station-1 Gap-1 Gap-3 Gap-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8

  16. Station-2 Gap-1 Gap-3 Gap-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8

  17. Station-3 Gap-1 Gap-2 Oct.1 Oct.2 Oct.3 Oct.4 Oct.5 Oct.6 Oct.7 Oct.8

  18. MIP Peak Positions @ Nominal HV oct1 oct2 oct4 oct6 St-1 oct3 oct5 oct7 oct8 gap1 gap2 gap3 St-2 St-3

  19. Plane Averaged Pedestal RMS oct1 St-1 oct2 oct4 oct6 oct3 oct5 oct7 oct8 St-2 St-3

  20. Noise RMS/MIP Peak @ Nominal HV St-1 St-2 St-3

  21. N/S .vs Operation Voltage +30V +50V +15V Linear Fit nominal St-1 -30V Nominal + Additional Voltage [V] St-2 St-3 Noise RMS / MIP Peak ADC [%]

  22. N/S~1% Suggested Voltage : Nominal + ?V St-1 St-2 St-3

  23. HV Configuration File Copy & paste phoncs@va011:~/hv_stuff/ hvcontrol_MutrN(S)

  24. Study From Run9

  25. HV Set to be N/S ~ 1.5% (North)

  26. Cosmic vs Beam (Absolute)

  27. SN vs HV (North) +50V +25V nominal

  28. Conclusion • MuTr Gain .vs HV were evaluated using HV scan data with cosmic • HVs are optimized to set N/S to be 1%. • New HV will be configured soon. • Will confirm N/S really comes as it desired with further data taking. • Need to confirm with beam data as well.