1 / 33

Paperless Douane et Accijnzen

Paperless Douane et Accijnzen. Paul Raes, Programma manager geïntegreerde verwerking Douane en Accijnzen Roger Beeckman, projectleider Paperless Douane en Accijnzen. Agenda. Stand van zaken “ Paperless Douane en Accijnzen” Operationalisering “ Paperless Douane en Accijnzen”

vanida
Download Presentation

Paperless Douane et Accijnzen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Paperless Douane et Accijnzen Paul Raes, Programma manager geïntegreerde verwerking Douane en Accijnzen Roger Beeckman, projectleider Paperless Douane en Accijnzen

  2. Agenda • Stand van zaken • “Paperless Douane en Accijnzen” • Operationalisering “Paperless Douane en Accijnzen” • Registratie en Identificatie van Economische Operatoren

  3. PLDA Stand van zaken • Analyse • SAD volledig • Web toepassing • B2G toepassing • Planning

  4. Analyse • Component registratie • Aantal beslissingen dienen nog te worden genomen • Component aangifte: • SAD aangifte afgerond: • Basis informatie verkregen vanwege experten • Ontbreken nog validatieregels • Financiële component: • Zo goed als afgerond • Aantal sub-componenten zijn reeds geïmplementeerd en uitgetest. • Goederenstromen of goederencomptabiliteit: • Analyse wordt beëindigd einde december • Stukken zijn reeds in ontwikkeling

  5. SAD Volledig – Web toepassing Upgrade 1e module wordt opgeleverd 09 januari 2006 • Voornaamste aanpassingen: • De horizontale en verticale scrolling wordt tot minimum beperkt • Een aantal drop downs worden toegevoegd • Bijkomende testen op niveau front end • Look en feel werd aangepast. • Mogelijkheden: • Insturen van een SAD aangifte (alle procedures en types) • Annuleren van een SAD aangifte • Wijzigen van een SAD aangifte

  6. SAD Volledig – B2G toepassing • De volgende versie’s van de MIG-’s zullen op 9 januari 2006 geïmplementeerd zijn: • SAD xml 1.8 • SAD EDIFACT uitvoer V1.6 • SAD EDIFACT uitvoer V1.6 • Let wel: bepaalde nieuwe velden worden niet gemapt • Een overzicht van deze velden zal op site worden geplaatst • foutmelding • Bijkomende publicaties: • Validatieregels zoals aanwezig in de versie van 9 januari 2006 • Correlatie tabel XML – EDIFACT – velden enig document • Mogelijkheden: • Zijn identiek aan de web toepassing.

  7. Pakket 1 Module 2.1 Pakket 1 Module 2.2 Pakket 1 Module 3 Pakket 1 Module 1update Pakket 1 Go Live Planning - Pakket 1 “Paperless Douane en Accijnzen” 03/04 2006 17/04 2006 26/12 2005 09/01/ 2006 20/02 2006 20/03 2006 01/05 2006 06/03 2006 12/12 2005 15/05 2006 Wk48 2005 23/01 2006 06/02 2006 27/03 2006 10/4 2006 02/01 2006 13/02 2006 13/03 2006 24/04 2006 27/02 2006 08/05 2006 16/01 2006 30/01 2006

  8. Inhoud van de modules - module 1 update • Pakket 1 – Module 1 (update) -> 9 januari 2006: • SAD normale en vereenvoudigde procedure: • insturen, wijzigen, annuleren • berekeningen • Goederenstroom • Customs events • Financiële comptabiliteit • Klantenrekening (aanschrijven + borgen certificaten) • Betalingen • teruggaven

  9. Inhoud van de modules - module 2.1 • Pakket 1 - Module 2.1 -> 13 februari 2006 • Aangiften: • Gegevensuitwisseling BIRB • Verlegging inzake BTW • Goederenstroom: • Summiere aangifte • Write off (deel 1) • Financiële comptabiliteit • Klantenrekening (deel 2) • Ontvangen betalingen • Kas functie

  10. Inhoud van de modules – module 2.2 • Pakket 1 – Module 2.2 -> 13 maart 2006: • Aangiften: • NCTS aangiften • Gecombineerde aangiften • goederenstroom: • Write off (deel 2) • transfers • Financiële comptabiliteit • Bank statements

  11. Inhoud van de modules - module 3 • Pakket 1 – Module 3 – 15/04/2006 • Statistieken • Uitwisselen gegevens met andere autoriteiten

  12. Diversen • Wijziging bericht Lyst en afgeleiden ervan (luchtvracht) • Paswoord wordt vervangen door lysthouder ( = firma/magazijncode) • Quality review van de MIG’s • Opvolgen B2G • Alle informatie PLDA te bereiken via: • http://fiscus.fgov.be • Testen van B2G is heel belangrijk • Problem reports: PLDA.test00@minfin.fed.be

  13. Registratie en Identificatie van Economische Operatoren EORI

  14. Economic Operator Registration & Identification • Objective • Once only registration • Contribution to objectives Customs 2007 • Cooperation with other authorities • Facilitation of trade • Improvement of risk management and client insight • Stimulate and foster interoperability and synergy project in other area’s • Provide convergence framework for exchange of data between customs administrations for clearance of goods

  15. EORI - Deliverables • Study of the As-Is situation • Recommendation for the To Be solution • Requirements for the chosen To Be solution • System development • Process roll out

  16. Study of the As Is situation • Complete questionnaire • Contact person in the MS ? • Summary of the answers • Description of the As-Is situation

  17. Recommendation future registration system • Suggested general approach • Strengths and Weaknesses of the proposed solution(s)

  18. Requirements future registration system • Business requirements • System requirements • Legal requirements

  19. High level planning 1 Questionnaire 2 As-Is study 2 Summary answers questionnaire 3 Recommendation 3 Proposal Recommendationpreparation group 4 Requirements 4 Requirements ready for discussion meeting Stop/Go Stop/Go Stop/Go E-Customs 2 3 4 EORI 1 2 3 4 2 3 4 Sept 2005 Oct 2005 Nov 2005 Dec 2005 Jan 2006 Feb 2006 Mar 2006 Apr 2006 May 2006 Jun 2006 Jul 2006 Aug 2006 Sept 2006 Oct 2006 Nov 2006 Dec 2006 Jan 2007 Feb 2007 Mar 2007 Apr 2007

  20. Project organisation TRG & EORI-WG Preparation group TCG BE LU RO TRG1 E-Customs CPG ES BG DE TRG2 TRG3 EE FI PT TRG4 FR AT CZ LT LV PL TRG… IR HU NL SE DK SI IT GR SK CY MT UK

  21. EORI Project group • BE • Paul Raes, Sven Forster, Els De Pril • DE • Stefan Wesp, Karin Birke, Uwe Herchenroeder, Matthias Schreier, Marianne Neumann • EE • Tiia Lutsoja, Urve Remmik • FR • Géraud de Bonafos • LT • Sigitas Dobkevicius • NL • Jos van den Berg • SE • Roger Lündström • SK • Ms. Barbara Lajzová • UK • Dave Morgan

  22. The Trade Reference group • Limited number of participant: max 5 • Representative for the different segments of trade that could be considered from the point of view of registration and identification, i.e. • multinationals that have branches in different countries who are active on their turn in more than one country • operators acting in a centralized way • operators acting from distributed profit centers that do not have juridical independency • small and medium sized operators • operators established in one country only but with activities in clients and providers spread over many countries. • service providers: carriers, handlers, forwarders, customs brokers, … • ….. • Project meeting of 19/1/2006 will make selection from the received proposals, trying to get a representative mix of the different segments

  23. TRG – expected contributions • Evaluation and comments on the as-is descriptions • Active Contribution and proposals for • the recommendation • the requirements

  24. TRG – resource estimate • Traveling and hotel cost for 2 times a full day (10:00 – 18:00) plenary meeting, possibly with break out groups on partial issues, in March and September 2006. An additional meeting before summer holiday might be necessary. This is to be evaluated on the Jan 2006 meeting. • 20% – 40% FTE for electronic contribution on proposals: news groups, review of documents, … • Information sessions to trade groups you can be considered representative for the represented segment of trade, with feed back and reporting on results to the project group. • Contribution to the Trade Contact Group Briefings of April and November 2006: each 2 days preparation (1 man day for electronic exchange spread over 14 days and 1 day meeting) and 1 day for briefing

  25. To do • Who do you want to present for the trade reference group ? • Date due : 06/01/2005

  26. Reorganisatie van de processen

  27. Het proces - Invoer

  28. Het proces - Uitvoer

  29. Nieuwe organisatiestructuren

  30. Organigram – Gewestelijke Directie Centrum Directeur Doelgroepenstrategie Doelgroepenbeheer Gegevensbeheer Klant-behandeling Mobiel toezicht Geschillen Vergunningen en audit Klantcoörd. En adm. En Bkh controle Regiekamer Mobiel toezicht

  31. Organigramme – Bureau Unique Directeur Enig Kantoor JuristReglementair bemiddelaar Toezichtsambtenaar Afdeling Inning AfdelingAagniftebeheer Helpdesk TeamOntvangsten Team Uitgaven en borgtochten Aangifte-behandeling Opvolging aangiften Afsluiting en verificatie

  32. Laad en Losplaatsen TeamOpvolging aangiften Nouvelle structure D&A Gewestelijk Directeur DirecteurEnig Kantoor Inning Afdeling Inning AfdelingAangifte-beheer Bureaux Andere diensten betrokken bij de aangifte-behandeling Bureaux Kantoren Aangifte op papier Opvolging van de aangiften

  33. Vragen ?

More Related