An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Euclid Corridor Transportation Project Construction Management Mac McOmber

  2. Team Organization • Flexible team concept - size varied as dictated by work activities • Staffing - Minimum 3 members, Maximum 23 • Team comprised of 7 different firms • Washington Division of URS, Lead • GCRTA, Resident Engineers • ODOT, C03 Team • Ralph Tyler Companies, Subcontractor • Quality Control Inspection Services, Subcontractor • Dalia Consultants, Subcontractor • Regency Construction Services, Inc, Subcontractor • 25% Disadvantaged Business Enterprise Goal Employee Presentation - p 2

  3. Team Organization • Teams aligned to Contracts • C01 Transit Zone, based at WD-URS office • C02 Public Square to Innerbelt, based at WD-URS office • C03 Innerbelt to E79th, Based at E55th field office • C04 E79th to Windermere, based at E105th & Chester field office • C05A F & I of Stations Project wide, based at RTA office • C05B Project wide Signals, Communication and Power, based at RTA office • C06 Hayden/Central Maintenance Facilities upgrades, based at Hayden Garage • Support/Admin Personnel, Based at WD-URS office Employee Presentation - p 3

  4. Team Organization Construction Manager QA/QC Manager 38-C01 R.E. Inspectors 38-C02 R.E. Inspectors Safety Manager 38-C03 R.E. Inspectors Scheduling Asst. 38-C04 R.E. Inspectors Office Engineer 38-C05A R.E. Asst. Office Eng. 38-C05B R.E. 38-C06 R.E. Admin. Asst. Employee Presentation - p 4

  5. Design Phase Services • Coordination - Utilities • Design review (60%, 90%, 100%) • Value Engineering / Constructability • Project Controls • Baseline Schedule Development • A/E Unit Price Estimate Review • Project Administrative Setup Employee Presentation - p 5

  6. Construction Services • Coordination – Utilities, Public & Other Projects • Construction Inspection • Safety & Quality Assurance Oversight of the Contractor programs • Project Controls • Scheduling • Estimating / Change Orders • Document Control Employee Presentation - p 6

  7. Challenges • Team Alignment • Varied firms, one process • Interface/Support Points • City of Cleveland vault project • Cleveland Water Department 42” water line replacement project • Water Pollution Control sewer replacement project • Cleveland Public Power betterments • Cleveland Clinic construction • NEORSD projects • Speech and Hearing Center • New CVS building • Utility upgrades/conflicts • DEOG • AT&T • Adesta • CEI • Time Warner • Cavalier • Forest City • SBC • Cleveland Thermal Employee Presentation - p 7

  8. Challenges • Stakeholders • Keep access to allow business to operate • Small renovation projects (surprises) • Functions • Tree lighting ceremony • 100 year anniversary of Cleveland Water Department • Ingenuity festival • St. Patrick’s Day parade • 4th of July Concert on the Square Employee Presentation - p 8

  9. Success • Safety • Project Recordable Rate 2.26 • Project Days Away Rate of 1.81 • Two Interim Openings, on schedule • No Anticipated litigation • All claims settled to date • Grand Opening Ceremony slated for 10/25/2008, on schedule Employee Presentation - p 9