WCCUSD Bond Program Construction Update. Edward Downer Elementary School Playfield Renovation Status Update 06/10/14. Construction Manager: Gabriel Fortich (SGI) Project Engineer: Shawn Fitzgibbons (SGI) Inspector of Record: Man Wah Cheng
E N D
WCCUSD Bond ProgramConstruction Update Edward Downer Elementary School Playfield Renovation Status Update 06/10/14
Construction Manager: Gabriel Fortich (SGI) Project Engineer: Shawn Fitzgibbons (SGI) Inspector of Record: Man Wah Cheng Architect of Record: Rod Sepulvida (BCA Architects) General Contractor: Maggiora & Ghilotti, Inc. Edward Downer Elementary SchoolPlayfield RenovationProjectProject Team
DEMOLITION OF EXISTING ASPHALT PAVING AND MISCELLANEOUS ITEMS TO BUILD A NEW GRASS FIELD INCLUDING ROUGH AND FINISH SITE GRADING, IRRIGATION, PLANTING, AND FIELD DRAINAGE. ELECTRICAL SCOPE CONSISTING OF POWER AND DATA CONNECTION TO NEW IRRIGATION CONTROLLER AND PROVISION OF CONDUIT AND FULL BOXES FOR FUTURE LOW VOLTAGE SYSTEMS. Edward Downer Elementary SchoolPlayfield RenovationPROJECT SUMMARY
Edward Downer Elementary SchoolPlayfield RenovationProjectProject Summary
Project Duration: 180 (Calendar Days) • Notice To Proceed Date: May 19, 2014 • Completion Date: Nov 15, 2014 • Percent Complete:18% • Base Contract Amount: $563,226.00 Edward Downer Elementary SchoolPlayfield RenovationProjectGeneral Information
Edward Downer Elementary SchoolPlayfield RenovationProject Site Demolition
Edward Downer Elementary SchoolPlayfield RenovationProject Clear and Grubbing
Edward Downer Elementary SchoolPlayfield RenovationProject Utility Trenching
Edward Downer Elementary SchoolPlayfield RenovationProject Electrical and Signal Conduit
Edward Downer Elementary SchoolPlayfield RenovationProject Sub-Grade Preparation